Process engineer. Energy, infrastructure, industrial decarbonisation, P(๐net0|โข๏ธ๐) less than P(๐net0|โข๏ธ๐). Views my own. Ember42 at m** or BS
I have been playing around with an interesting concept here - the tradeoff curves of capacity vs storage.
First for a completely clean + storage system. This is what we need for Ontario for a no FF system, assuming starting from scratch for clarity.
@Phrankensteyn@Dr_Keefer If we had switched track to build a pair of EC6โs in 2012 (when the badly designed procurement came in high for the ACR), we would not have done this refurb as we would have had a active new plant pipeline.
But Pickering refurb is the soonest available 2GWโฆ
@bataille_chris The big question here is how much of the cost for unit 1 is delays and rework due to incomplete engineering vs. Inherent equipment and productive labour cost?
I still expect a well executed big reactor to be substantially less expensive than a well executed similair small one.
@tomas_lamy@MatthewWithy And there isnโt a particularly compelling reason to need cell or module production on site with the vehicles.
Vaguely nearby to minimize transport costs, sure, but does not need to be collocated.
@ExnerPirot@OConchobhair1 Since PV production doesnโt able any other strategically critical sectors, and it will only ever be a minor contribution to the energy supply in a northern country like Canada, this is why itโs fine for us to have dropped PV import tariffs on China.
@NiyerEnergy Reduced BoP cost due to better temperature tolerance (I.e. passive vs active thermal management) should be the biggest carrot for sodium. In select applications.
@bataille_chris@ryankatzrosene That also looks like the bulk of the โbonusโ is north of the hydro system.
All that to say โdroughtโ and โlow resevoir accumulationโ could be substantially different phenomenaโฆ