Phase 2 of @Zetarium_ is on fire and you can't miss it because it won't last much longer.
You must be wondering what's new, so here it is:
🔹 New social quests
🔹 5% increase in Zdex points
There's also the Prediction Market platform, which has been completely redesigned with a new look.
Continue your journey by making some swaps and doing the Daily GM Claim every day.
I accumulated 1600 points in @Zetarium_ and I'm locked in until the TGE doing some tests to see how to spend less on TX to generate more points. Tell me how your strategy is going.
Basically, my actions today were:
▪️ Daily GM
▪️ZDEX
▪️ Prediction Market
▪️ and chatting on X to see if it gives more points.
Don't forget Discord, there's a lot going on and we can't be left out. There are many roles that can already be earned, and I'm pursuing that.
21.2M points have already been distributed in a campaign to earn extra points for possible $ZET rewards.
The next evolution of AI isn't just about responding better.
It's about acting better.
Imagine a model that:
▪️ Analyzes data
▪️ Makes decisions
▪️ Executes the action
▪️ Adjusts strategy in real time
We are entering the era where models take real actions, interact with systems, and complete tasks from start to finish.
That's the power of a #LAM
@ActionModelAI is exploring exactly this frontier.
Want to know more? The platform has already surpassed 100k users in just over a week since its launch. I'll leave the link below.
#ActionModel
Get ready for the SVW Genesis Sprint!
Intense competition, innovative gameplay, and epic rewards await you.
Just keep playing @wanted_global and completing the quests.
The Zealy campaign is live from February 2nd to February 22nd with a total prize pool of $1,000 USDC.
Don't miss the chance to show off your talent and win incredible prizes!
@pryzm_gg
#SVW #Pryzm #Web3Gaming #Zealy
🔥 The SVW Genesis Sprint has officially begun — and this is your chance to be part of the Genesis era.
For 21 days (Feb 2 → Feb 22), jump into real SVW gameplay, complete wallet-verified Zealy quests, climb the leaderboard, and battle for a $1,000 USDC prize pool 💰🏆
Join the campaign here 👇👇
https://t.co/mpCXs8K5S3
Daily action = bigger rewards.
Are you ready to sprint to the top? ⚡🎮
@pryzm_gg x @wanted_global
#SVW #Pryzm #Web3Gaming #zealy
Do you know the main blockchain of the @IOPn_io , created to be fast and accessible to everyone?
I'm talking about OPN Chain, which acts as the engine of the ecosystem.
▫️ If you've ever used Ethereum-based apps, you'll feel right at home here.
▫️ It was built with tested technologies to ensure everything runs smoothly and quickly.
▫️ It processes more than 10,000 transactions per second.
▫️ It confirms transactions in less than 1 second.
OPN Chain is a rocket a fast, secure, and uncomplicated blockchain.
The super-intelligent robots with the OM1 system from @openmind_agi are now available for pre-order.
Everything is ready, made with great safety precautions. Shipments will begin next year. If you want a companion, now is the time.
But don't worry, everything has been done to maintain the safety of their owners.
At the moment, they don't climb stairs, and for safety, there's a total locking button in the Unitree app.
The audio and video system can be deactivated at any time, but don't worry, their faces will be blurred and won't be saved.
It's not yet waterproof, and its battery lasts 3 to 4 hours on a single charge. Its price is around $660.
OpenMind is working to enable complete autonomy in robots. The BrainPack provides mobility, perception, and intelligence to Unitree robots.
BlackOpal has just launched LiquidStone II on Nest, and it's the first time you can invest in Brazilian credit receivables directly on the blockchain.
How does it work?
When merchants wait weeks to receive credit card payments, BlackOpal buys these receivables in advance. As payments arrive, the returns are distributed to those participating in the nOPAL vault.
Just follow these steps:
🔸 Deposit pUSD
🔸 Receive nOPAL
🔸 Receive 20.9 APY
Redemption takes 7 days, so plan accordingly. When you obtain nOPAL, you earn PNP.
Based on real payments from Brazil, one of the largest card markets in Latin America, Nest is expanding access to real assets by connecting Brazilian credit networks to global opportunities.
@plumenetwork@PlumeinBR
116,785 PP accumulated on the @plumenetwork , don't forget to show your performance!
I know we're in a downturn, but several opportunities arise when everyone is desperate.
Just believe that better days will come for the Goons.
Let's plant now to harvest in Q1.
Have a great week full of PP!
gPlume
A profitable day of point mapping with @openmind_agi
We were experiencing some delays in earning points, but it seems the team has now resolved the issue.
✔️ However, always check if your Bluetooth is enabled,
✔️ your location services are on,
✔️ and if you haven't already earned your 11 daily points.
Even so, if the problem persists, try restarting your device, as the moderator informed us on Discord that everything should be resolved.
Openmind is bringing robotics to web3, all working together to create intelligent robots.
3,150 PP earned on @plumenetwork in one day, and I do practically the same interactions every day.
The main dapps I use daily are:
▫️ mystic
▫️ morpho
▫️ stake
▫️ rooster
▫️ curve
I'm also using Nest a lot after its update; I'm trying to earn more PNP.
Currently, I'm ranked 1165 and I'm comfortable with my position.
I believe I can still climb higher in the rankings, considering that the season should only end in Q1 of 2026.
gPlume goons
Today I'll show you my strategy for earning points in the new @StandX_Official campaign.
My daily routine involves performing several swaps per day; that's what's giving me a lot of points: 1,983 PTS.
I have 50 tDUSD in perpetual contracts and now I have 228.3 PTS accumulated.
I have 80 PTS accumulated in trading; the rule is that a trade of 100 tDUSD is worth 10 PTS. Since I'm not good at trading, I'm focusing more on doing several swaps.
This is my current strategy. It may not be the most profitable in terms of earning points; I haven't yet tested creating a Liquidity Provider. I'll try to track my point earnings for a week and maybe I'll change the strategy the following week.
#StandX #StandxAlpha
Another day using the OPN created by @IOPn_io , a blockchain built with EVM technology for developers and enthusiasts looking for near-instantaneous transactions.
Predictable and low transaction costs with no surprise fees.
The minimum price is 7Gwei, which we can say is the lowest on the EVM network. Best of all, there are no gas spikes during peak network usage.
A network created for everyone, from developers to node operators.
Accelerate ⋂
Are you already familiar with @AquaFluxPro RWA yield model called Tri-Token: P, C, S?
You choose between security, income, or risk.
I'll explain it to you in a straightforward way.
#PharosPathfinders#Week1@pharos_network
After a market pullback, @plumenetwork price today is $0.03 with a trading volume of $70,798,335 in the last 24 hours.
Plume all-time low occurred on October 10, 2025, at $0.01 👀
What can we say about this Plume dump?
Is RWA being discredited or was it motivated by profit-taking after the launch of Nest?
Even with a worrying scenario, I still think about Plume in the long term.
Don't despair and do crazy things now; it's time to look to the future of the project.
Plume is connecting real-world assets with DeFi, bringing income opportunities to the blockchain.
Just be a true Goon 🪶