Deep-Dive Thread
The biggest bottleneck in AI isn't Nvidia GPUs or data center power. It’s what’s happening inside advanced packaging cleanrooms in Taiwan and Korea.
Here’s why HBM and optical interconnects are locking down supply through 2029: 🧵👇
Look at the infrastructure numbers:
• Micron: 26 take-or-pay contracts backed by $32B in cash deposits
• Broadcom: Guiding Q4 AI chip sales to ~$22B ($230B by FY28)
• Coherent: Locked in a $2B direct deal with Nvidia
Ignore short-term macro noise.
Deep-Dive Thread
The biggest bottleneck in AI isn't Nvidia GPUs or data center power. It’s what’s happening inside advanced packaging cleanrooms in Taiwan and Korea.
Here’s why HBM and optical interconnects are locking down supply through 2029: 🧵👇
Stacking 12-to-16 DRAM dies via Through-Silicon Vias (TSV) consumes 2.5x to 3x the wafer area of standard DDR5. Every HBM stack cannibalizes conventional server memory.
Hock Tan calls current AI investing "casino gambling," yet Broadcom is projecting Q4 AI chip sales to hit ~$22B (up from $17B in Q3) on its way to $230B in FY28.
Sell the hype if you want, but the plumbing is printing real cash flow. $AVGO
Micron just opened its new AATT2 packaging fab in Taichung, and 2027 HBM capacity is already 100% sold out under firm contracts.
When memory packaging is booked 2+ years ahead, "AI overspending" debates don't match cleanroom reality. $MU
JUST IN: $MU and $SNDK shares slide at the open as China's $CXMT announced progress on a new 4F DRAM memory-cell architecture designed to increase chip density and efficiency, and announced plans to introduce DDR5 server memory using the technology by the end of 2026