Real estate development for Active and Reserve Military, Veterans, and affiliated civilians. Service-Disabled Veteran Enterprise. U.S. Marine Corps. Follow Us
We really can’t build fast enough! A waiting list is in short order. You can trust that we are going to deliver decent, safe and affordable housing to our nations most deserving patriots.
The new building is complete, just getting some areas cleaned again before upcoming Housing Quality Standards (HQS) inspections by Georgia Department of Community Affairs. We have received an overwhelming amount of interest from Veterans looking to move in.
Three existing historic structures, Building 19, 20, and 21, will be completely redeveloped into housing units for Veterans in addition to a new construction building adding community space for amenities, such as a computer lab and fitness center.
Gearing up for construction at our next historic preservation, adaptive-reuse development in Waco, Texas, on the Doris Miller VA Medical Center campus. 34-units of supportive housing for our nation’s most deserving patriots, United States military Veterans!
Elevator adjustment in Building 35 is complete, and the state inspection is being scheduled. Front entryway porch installation has began on Building 34. Additional hand rails have been installed at the front entryway as well. Completing doors, paint, and trim where needed.
Freedoms Path Dublin is nearing completion. We are on the home stretch. It’s do or die!
Elevator installation in Building 34 began this week. Roofer is complete on the top of the elevator addition.
“Those who know when to fight and when not to fight are victorious. Those who discern when to use many or few troops are victorious. Those whose upper and lower ranks have the same desire are victorious. Those who face the unprepared with preparation are victorious.”
—Sun Tzu
State inspection coming next. Starting construction on the Gazebo soon. We’ve had a lot of rain but as soon as it dries up some we will attack the exterior, stripping the parking lot, pouring concrete, etc.
On site at Freedom’s Path Dublin last week. Sidewalks are complete. Starting driveway/asphalt parking lot. ADA ramp access to Building 35 complete; installing railing next. Concrete slab for Gazebo and for the Community Garden is poured. Brick at elevator addition just about done
Grader will be grading to the sidewalks. Sidewalks at New Building are poured. Forming rest of the ramp for ADA entrance to Building 35. Sidewalks should be finished this week. Brick at 34 elevator add continues. Just about ready to get elevator company to come out and inspect.