OverSightly is oversight software for small businesses and solo operators running delegated and AI work. It's in build. While we build it, we're publishing how it goes: the receipts, the proofs, and the bugs.
The blog is called Notes from the build. First case study is up: we set resource ceilings on our own services, tried to break them, and published all seven proofs. Plus the four bugs the proof turned up. Both halves, on purpose.
https://t.co/8tFnMErF7X
We're also open-sourcing the tools the fleet built for itself, one at a time. First up: run_verify, the tool that proves which model actually served an agent run, from the run's own record. The profile is live, and the first repo lands shortly.
https://t.co/6VVheVJLvS
@amitmuflis The notebook test is a good one. If you can open it, read every line, correct it and take it with you, it's your memory. If it only lives in one provider's system and format, swapping the model doesn't free you. The part that knows your business stays behind.
@Airo_07 That last line is the real risk of the one person setup. Agents agreeing is not a review process. Someone or something in the loop has to be able to say "this is wrong" and make it stick, or a hundred agents just scale up one person's blind spots.
@OneManLBO That part is the easy half to picture. The harder half is knowing what they did while you were not watching. A one-person operation has no spare reviewer, so the record of the work has to do the job a team would normally do.
We publish the ideas we rejected, with the reasons.
https://t.co/cuIj4fqDxE
Building in public usually means posting the wins. The rejections say more about how a team thinks: what it almost built, and why it didn't.
Ours updates weekly.
What we added today.
Two disciplines went into how we're building OverSightly, and both run in our own operation first.
1. Rule changes get regression-tested. Every edit to the rules our agents run on gets checked old vs new against a fixed set of real cases. Rules that have proven themselves are locked. An edit ships only if it helps more cases than it hurts, and a rejected edit goes in a log so it never comes back.
2. Every change gets a folder before work starts. Why it exists, what it has to do, the approach, the checklist. When the work lands, the folder archives and its requirements fold into the living record, so finished work updates the truth instead of dying in a chat thread.
Self-improving systems forget. These are the brakes.
Zero is a real result, and one I can live with. An agent that reports nothing beats one that pads the list or hallucinates me into a mess. The risk is a quiet night looking the same as a dead one, and the difference between the two is real.
In my current stack I fly 75% blind, and I want both types of night visible in one feed. That's part of what I'm building into OverSightly.
The manager and new employee framing matches mine. When I tell an agent to fix something so it doesn't keep happening, it generally sticks. Over time they ask fewer questions.
3 months ago I asked for help and got a yes, but in 90 days. Buy the time 90 days rolled around, I’d built my way out of having someone under me feet and another salary. I’ll be reminding them of that at year end reviews.
But proposed and sometimes repeated lessons still need a review, and OverSightly puts them in one feed for that. My workload is so high and so much moving, I get bottlenecked by output and what I missed, not ability or throughput.
@richard_m_x The time saved is real. The catch is that five agents finish in parallel and the review lands on one person in sequence. Mine runs through Muse today. OverSightly expands and perfects that: one feed for everything the agents did, and a list of what I missed for my slow periods.
@andrew_jennings On the rubric: my doctrine is never ask a model for a number. Ask directly, the score compresses to the safe middle. Get the judgment in words against the rubric, then derive the score mechanically. I run panel grades and quality scores this way, and it's built into OverSightly.
@replay_0x Not the box, but the "feed me" status, absolutely. Mine runs through Muse today: a Slack-like master feed where every agent flows in and I act on it. OverSightly, still in build, expands and perfects that, with a What I Missed queue for when they outpace me.
@arthurliebhardt Agree, the harness on top is what makes it work. Mine is Muse driving lanes across 4 machines plus an on-demand Azure VM backup. It works, but it breaks under heavy workload and doesn't show what's in-flight, queued or stuck. That breakage is why I'm building OverSightly.
@jaesmail The babysitting is real, and a lot of it was how my agent asked. Dissertation-style questions I'd never answer became one-tap questions. One morning it sent 9 and I answered 8 before my feet hit the floor. In OverSightly, whatever I miss lands in a list I review in slow periods.
@SoufCH2 Then individual dashboards cut it down to just the agents you pick, by project, team, or goal. So you can see at a glance which one is stuck, which is waiting on an answer, and which is done, without watching every tab.
@SoufCH2 Usually 3 or 4 here too. The count is easy. The painful part is knowing which one is actually waiting on you. That's what we're building OverSightly around: one master feed where every agent drops its decisions, blockers, and finished work, flagged when it needs you.
@Briac_S That 11th hour is the one that matters. Time saved only counts if review is cheaper than doing the work. What's helped us is treating a done claim as a claim, and checking it against the actual output instead of reading every update.
@3ShibasDad I'd put "verify the final result" slightly outside the harness. A harness can remind an agent to check itself, which is still the same process grading its own work. The useful check looks at the artifact from the outside.
@dave8172 Ideally both, doing different jobs. Real-time tunnels between agents for the live back and forth, plus a well-designed, well-maintained second brain or wiki they all write to. The tunnels handle the moment. The wiki is what keeps the next agent from starting cold.