Gresser recently completed this manufacturing facility in Monticello that features a polished PrimX composite concrete floor system. Not only is it a beautiful looking floor, but the PrimX system will exceed any owners expectations for performance. #concrete#constructionindustry
We’re teaming with @GresserCo to construct a two-level podium project for @DoranCompanies at 3989 Central Ave in downtown Columbia Heights, MN. The mixed-use city hall/residential project is an Alatus development. Design by BKBM Engineers. #CecoConcrete
https://t.co/n6zKK1u4bA
@GresserCo recently completed this 150,000 square foot warehouse & distribution center at the Launch Business Park in Lakeville, MN. This brings the total PrimX jointless concrete floors in this park to over 450,000 square feet. #concrete@primxcomposite
Gresser completes this 360,000SF Costco Distribution Center in Owatonna, MN. This project included multiple outbuildings and an accelerated schedule.13,000 cubic yards of concrete in the foundations and slabs. #concreteconstruction#concretefloors#minnesotaconstruction#concrete
Off to a great start with foundations walls at The QUENTIN. The 79 new residences at The QUENTIN will have an emphasis on green space, daylight, & natural ventilation to reduce systems load & overall well-being. Thanks to Crowe Construciton, Cemstone, PERI, Rebarfab, and Sowles
@GresserCo battled heat, humidity, and rain to place a large post tension slab at Parkers Station Flats. The pour was over 800 CYs. Thanks to everyone involved: Inland Development Partners, @Urban_Works , @weisbuilders , @CecoConcrete , @AggregateUK , @amsysco, & Woodys
The best concrete structures get finished with some masonry veneer. This Rochester hotel is looking better everyday. We are glad to be apart of the exciting development going on in downtown Rochester. #masonrycontractor#masonry#constuction#rochestermn