81,000 Pounds. 3 Days. 5,700+ Cubic Feet.
When a historic building needed structural floor repairs, crews faced a challenge: filling a large enclosed space below the floor without putting workers at risk.
Using HMI’s large-volume FillFoam™ system, crews pumped 81,000 pounds of foam in just three days, working primarily through access points from above.
Check out the video to see how FillFoam™ tackled this unique project!
Have a large void to fill? Call HMI at 800-626-2464.
https://t.co/TkI94pswvJ
Great conversations. New connections. Engineered solutions.
That's a wrap on IRF R2T!
We enjoyed discussing how custom polyurethane chemistry, specialized testing, and engineering expertise can come together to solve complex infrastructure challenges.
We're looking forward to building on these conversations and putting science-backed solutions to work with HMI Contractors.
#HMIInfrastructure #IRFR2T #InfrastructureSolutions
Another successful HMI Soil Improvement Seminar in the books!
A big thank you to everyone who joined us last week for two days of learning, sharing experiences, and exploring soil improvement solutions.
From deep injection and permeation grouting to soil testing and real-world applications, we covered a lot of ground.
We appreciate everyone who took the time to join us and make this seminar a success. We look forward to seeing how you put what you learned to work in the field!
Thinking about starting a concrete lifting business? Or looking to add another service to your existing business?
Join us November 12–13 in Manitowoc, WI, for two days of hands-on concrete lifting training.
Learn the equipment, the techniques, and the business side of getting started.
There's still time to sign up! Contact us today: 800-626-2464
Tested for Performance. Engineered for the Challenge.
At HMI Infrastructure, we don't just supply polyurethane materials. We develop custom polyurethane formulations and use specialized testing to understand how those materials perform under real-world infrastructure conditions.
By combining polymer chemistry, mechanistic material characterization & 3D design, comprehensive field evaluation, and engineering expertise, we develop project-specific solutions designed to meet demanding performance requirements.
Custom chemistry. Specialized testing. Solutions backed by science.
Connect with our team at IRF R2T, Booth #127, to learn how HMI Infrastructure is taking a different approach to infrastructure challenges.
#IRFR2T26 #MaterialsScience #InfrastructureEngineering #PolyurethaneTechnology #RoadInfrastructure
HMI Geotechnical Engineer Will Sublette will be presenting at DFI51 in Orlando next week!
Join Will as he discusses “Soil Loss Behind Bulkheads and Sheet Piles,” a challenge facing marine and waterfront infrastructure.
▪️Tuesday, November 3
▪️4:40 PM
▪️Exhibit Hall – Regency Ballroom O-S
Attending DFI51? Be sure to catch Will's presentation and connect with the HMI team at booth #824
Custom Polyurethane Chemistry. Specialized Testing. Engineered Infrastructure Solutions.
As a Bronze Sponsor of the IRF Global R2T Conference & Exhibition 2026, @HMICompany brings specialized expertise in custom polyurethane formulations, advanced engineering, material science, and performance testing to complex infrastructure challenges.
From transportation and utilities to municipal, industrial, and structural applications, HMI goes beyond off-the-shelf materials—evaluating project conditions, developing tailored polyurethane solutions, and testing for measurable performance.
Meet HMI COMPANY at #IRFR2T26!
📍 Visit Booth #127 to connect with the HMI team and discover how custom polyurethane chemistry and specialized testing can help address your infrastructure challenges.
🌐 Learn more about HMI Company: https://t.co/1jXvVepWlk
🗓️ November 3–6, 2026 | San Francisco, California
#InfrastructureInnovation #MaterialsEngineering #RoadInfrastructure
Custom Polyurethane Chemistry. Specialized Field Testing. Mechanistic Material Characterization & 3D Design. Engineered Infrastructure Solutions.
HMI and PSI Technologies are excited to announce: HMI Infrastructure. We develop custom polyurethane formulations backed by specialized testing, advanced engineering, and materials science to tackle complex infrastructure challenges.
From transportation and utilities to municipal, industrial, and structural applications, we don't just offer off-the-shelf materials. We evaluate project conditions, develop tailored polyurethane solutions, and test for measurable performance.
We're bringing this approach to IRF R2T conference, Booth #127.
https://t.co/o9Hmqj4J3E
#IRFR2T26 #IRFGlobal #InfrastructureInnovation #MaterialsEngineering #RoadInfrastructure
HMI is heading to ASCE Wisconsin!
HMI's Geotechnical Engineering Team is looking forward to connecting with engineers and industry professionals to talk soil improvement and solutions for what's happening below the surface.
From soil stabilization and void filling to custom polyurethane solutions, we're ready to talk through the challenges you're seeing in the field.
More Skills. More Projects. More Opportunities.
HMI's Soil Improvement Seminar is just 2 weeks away!
Join us October 29–30 for two days of training covering Deep Foamjection, permeation grouting, seawall repair, soil testing, and more.
Work alongside industry professionalsand learn how to put these solutions to work on your next project.
▪️Manitowoc, WI
▪️October 29–30
Don't miss your chance to join us! Call and reserve your spot today: 800-626-2464
https://t.co/XjtCJye6Nv
HMI is Heading to DFI51 in Orlando, November 2-5!
Rising water levels and challenging soil conditions are creating new demands for infrastructure and foundation projects.
From soil stabilization and permeation grouting to water control and void filling, HMI offers engineered solutions to tackle challenging subsurface conditions.
◼️Stop by booth # 824. Connect with HMI's geotechnical engineers, Will and Ben, to talk through project challenges, explore solutions, and see how we can help on your next project
What do you do when you have 1,000+ cubic yards to backfill and limited access to get material in?
On this project, sidewalks, landscaping, other crews, and an occupied property made conventional aggregate difficult and labor-intensive.
The solution was HMI’s FillFoam™.
If your crews are taking on large voids, trenches, or hard-to-access backfill projects, FillFoam gives you another way to get the job done.
Watch the video to see it in action: https://t.co/B9HpHhhw35
Just because a slab is level doesn’t mean it’s supported.
That’s where undersealing comes in. Instead of raising the concrete, the goal is to fill unsupported areas and restore support underneath.
Lifting fixes elevation. Undersealing fixes support.
See how it works and when to use it: https://t.co/PVriUyuQLu
Soil improvement can open the door to projects beyond traditional concrete lifting.
Join HMI for our Soil Improvement Seminar and get hands-on with the tools, materials, and techniques used to tackle real-world soil problems.
Learn about:
▪️Deep Foamjection
▪️Permeation grouting
▪️Seawall repair
▪️Soil testing with DCPs
▪️Designing & bidding soil improvement projects
You’ll learn alongside experienced industry professionals and walk away with practical knowledge you can take back to the field.
Add more capabilities. Take on more projects.
🟥More engineering support is coming to Team HMI!
This October, we’re adding another geotechnical engineer to the HMI team; giving our contractors another technical resource to turn to when tough jobs come up.
Stay tuned. We’ll introduce the newest member of the team soon!
You pull the trigger, the foam goes in, and the slab starts moving. But what’s actually doing the lifting?
It’s more than just foam expansion.
The foam first fills the open space beneath the slab. As that space gets tighter, pressure builds. Once there’s enough pressure, the concrete starts to move.
Understanding what’s happening under the slab can help you understand why one injection point may react differently than the next.
Check out our latest blog to learn more: https://t.co/rieqU8TaGa
Thinking about starting a concrete lifting business? Bought used equipment or took over an existing operation?
🟥Start with the right training.
HMI’s 2-Day Training Seminar covers the hands-on skills and the business side - equipment, estimating, bidding, maintenance, marketing, and more.
Whether you’re starting from scratch or already have the equipment, get the training to put it to work.
🟥Learn more & register: https://t.co/YWq1uQ1Mb8
Watching a slab move fast feels good; but faster foam doesn’t always mean a better lift.
If the foam reacts too quickly, it may start building up before it has a chance to spread where you need it. That can mean more holes, more drilling, more material, or areas under the slab that still need support.
The goal isn’t to see how fast you can move the concrete. It’s to get the foam where it needs to go and leave the slab properly supported.
We break down it down in our latest blog: https://t.co/nOgCdfnlaA
When it comes to polyurethane foam, reaction speed can affect how far the material travels beneath the slab before it builds structure.
Knowing the difference can help you choose the right foam for the job.
Read the full breakdown here: https://t.co/hJEAnLHEmJ
🟥Old pipe stays. New liner goes in. FillFoam™ fills the gap.🟥
During a storm pipe rehab project, a new liner was installed inside an existing deteriorated concrete pipe—leaving an irregular void that needed to be filled.
FillFoam™ was produced onsite and pumped through approximately 40 feet of annular space to support the new liner and fill the void—all without tearing out the existing pipe.
Another way FillFoam™ can tackle the spaces conventional fill can’t easily reach.
🟥Check out the full case study: