@jxminiemxchi@krishisstressed i think the more feasible way would be to get njt to rutherford and then walk, theres sidewalk most of the way there
though the police might still block it so
Energy requirements for data centres currently in the Scottish planning system is between 4450 MW and 4950 MW, which is larger than the winter peak electricity demand for the whole of Scotland.
The Scottish government is putting power for the tech giants before people.
@iam_me31244@MovetheWorld9 no its not a bottleneck, the problem is that due to the location of the original station, trains heading southbound have to foul the northbound fast line to access the station. thats obviously going to delay northbound trains if the timing isnt perfect, which it often isnt
@iam_me31244@MovetheWorld9 the Darlington upgrade prevents delayed saltburn and southbound mainline trains from further delaying northbound traffic. it improves reliability on the ecml as a whole.
@transjewtalian its just specifically takeaway food. chinese takeaway is not the same thing as chinese food.
like you wouldn't call a hotpot restaurant "having a chinese"
also we do say, "having a full english"