HOME OF THE UAAP 🏠
Take a look at the 3D walkthrough of the 6,000 seater UAAP Arena.
The construction is scheduled to be completed come UAAP Season 89. Shaped like the infinity ♾️ symbol, the arena represents the 8 UAAP member schools.
#UAAPxAkari#HomeOfTheUAAP
TAGUIG GHOST INFRA PROJECTS UPDATE # 3:
Ang daming damning (evidence).
The plot thickens.
The list lengthens.
The case strengthens.
Kung merong ‘shoot sa balde’, meron ding
SHOOT SA KALDERO.