Consumer unit relocated and upgraded with @cpfusebox 20-way SPD unit ready for an extension and refurbishment at this property ⚡️ @ Newbury, Berkshire https://t.co/TuGHomgOha
Light replacements! Do you have any light fittings you would like replacing or maybe your lights don’t work?
Maybe you’re a business and have a number of fittings you would like replacing? If this is the case please send us a message for a free evaluation!
Number of 8 outside lighting points installed including 6 bollard lights and 2 RGD colour changing lights.
All cables wired in SWA and buried where possible.
If you have an outside space and are interested in an evaluation please get in contact in order to arrange a site survey.
Big thanks to Paul Reay @Ultimate_Signs1 for doing what he does best! We now look forward to growing the fleet.
All our graphic design is carried out by Liam Hogan to the best detail, as you can see.
Back at St Ethelberts School last month - @EthelbertsSch
Installation of 4x 20A supplies for aircon units.
Couldn't handle the heat this summer? Get in touch with the team over at @protocool_uk
1st fix wiring completed today. New circuits available for all budgets whether your establishment is domestic or commercial! Call now for a free evaluation!
Here's what the team have been up to so far this week. 2 mains consumer units upgraded and a total of 16 circuits tested. Some observations made and remedial works booked for next week. Another happy customer!
Storage Heating. Replacements and new installations available.
From January 2018, all local space heaters manufactured for sale into the EU must comply with a minimum efficiency standard under Lot 20 of the Energy Efficiency Directive.
Get in touch for a free evaluation.