Traditionally, Grandmothers gave babies a warm oil massage before bathing, then gently moved the arms and legs while washing.
Research suggests infant massage promotes relaxation and caregiver–infant bonding, while these movements gently mobilize joints without forcing a stretch.
When things change in the future and the Deepam is finally lit, those who opposed it must face such consequences that no one should ever dare to think of obstructing such divine activities again 🙏
Thiruvannamalai Karthigai Deepam..I still can't put that feeling into words.
Seeing the sacred fire glowing atop the hill, something within me felt different. It's as if I'd stepped into another world. The entire place felt mystical & beyond. Some experiences stay with us forever
A rare celestial spectacle at Sri Ananta Shayana Swamy Temple.
Every year, during Karthika, the Sun's rays touch the Lord's sacred feet and gradually move upwards, reaching His forehead on Akshaya Tritiya.
Truly a divine sight to witness!
We've seen processions where movie songs take over.
But this hits differently! A group vibing to Lord Ayyappa Bhajans during their Kodaikanal trip. The chants, Pure energy and Goosebumps 💥
Moments like these keep our roots and traditions alive.
Kudos, thanjavur_mapla/ig 🙏👏
What is destiny, really? Is it a story already written, a consequence of our past, or a possibility waiting to unfold?
An intriguing glimpse into the conversation between Sadhguru and Shi Heng Yi on the Mulligan Brothers podcast.
Some places make you wish time would just stand still 🪷
The serenity of Dhyanalinga is something else. Who else would love to soak in this heavenly atmosphere, leaving behind all the noise of the world? 🙏
ఈశావాస్యమిదం సర్వం యత్కించ జగత్యాం జగత్।
Īśāvāsyam idaṃ sarvaṃ yat kiñca jagatyāṃ jagat ।
(Everything in this universe, whatever exists in this world, is pervaded by the Divine.)
Om Namah Shivaya 🙏
After a long time, finally made a visit to Annavaram ❤️
Had a peaceful and blessed darshanam of Sri Satyanarayana Swamy.
The Karthika Masam vibes, beautiful Ratnagiri Hills, sundial, goshala and, of course, Annavaram prasadam made the trip even more memorable! 🙏😋
Adiyogi, the timeless symbol of stillness, wisdom and boundless consciousness. There is something deeply profound about his presence, a reminder of the spiritual depth of Bharat and the eternal wisdom of Shiva. 🙏🕉️