The Western Dedicated Freight Corridor (WDFC) runs from Dadri near Delhi/NCR to Jawaharlal Nehru Port (JNPA) near Mumbai/Navi Mumbai, covering roughly 1,500 km.
Yesterday, PM Modi inaugurated the last three unfinished sections, covering 326 route-km at a cost of
1/2
🏗️ Construction Job Vacancy 🏗️
यहा��� आपको मिलेंगे भारत के हर कोने से कंस्ट्रक्शन सेक्टर के लेटेस्ट अपडेट्स:
👷♂️ Jobs
📄 Tenders: Recent Published & Awarded Tenders (NHAI, PWD, Railway & Private).
✅ सबसे तेज़ और सबसे सटीक जानकारी के लिए अभी Follow करें और Bell Icon 🔔 दबाएं!
ENGINEERING, PROCUREMENT AND CONSTRUCTION FOR PROVISION OF DEFICIENT MARRIED ACCOMMODATION FOR OFFICERS (LT CDR AND ABOVE) (G PLUS 32) AT NOFRA, COLABA, MUMBAI
Tender ID 2026_MES_753641_1
Tender Value in ₹ *148,34,00,000*
Bid Submission End Date 06-Apr-2026 06:00 PM
Larsen & Toubro received an EPC order amounting to ₹5,000-₹10,000 crore.
In this contract, L&T will design, supply, and construct two 220 kV Gas Insulated Substations and 05 substations with 250 km of overseas transmission lines in West Bengal.
(Save Energy, Save Future)
Design, Supply, erection, testing and commissioning of 2x25 KV, 50Hz, SP/SSP/TSS and Electrification of SSP/SP/TSS buildings in Dholpur-Sirmuttra section i/c with GC work of DHO-SRMT project of AGC Division in N.C. Railway
Tender Value: 26,55,51,734
Closing Date: 04/07/2025
Design, Supply, Erection, Testing & Commissioning of 25 KV AC OHE work between Amjhera- Dhar section in connection with new line between Dahod-Indore, in Ratlam Division of Western Railway
Tender Value : 12,13,93,414
खलीलाबाद–बहराइच रेल प्रोजेक्ट 🚆
पूर्वांचल को मिलेगी नई रफ्तार!
240 किमी लाइन ₹4,940 Cr में मंज़ूर (2018), पूरी होगी 2027 तक
📍 भूमि अधिग्रहण जारी (85 गांव)
🛤 नए स्टेशन: बंसी, बत्सा-पिड़िया
#Khalilabad#Bahraich#Railways#UP#Bansi
DRA Infracon–Siemens JV bags LoA for S&T Package S-1 of Mumbai–Ahmedabad Bullet Train Project. Contract worth ₹4,140.06 Cr covers end-to-end design, installation & commissioning of S&T systems for the High Speed Rail Corridor.
The ambitious 489KM Bilaspur-Manali- Leh Rail line Final Survey, DPR done & now land acquisition pending. Cost is over 1.3 Lakh Crore
270 Km will be Tunnel & it will surpass China's Qinghai Tibet line to became highest Rail line in world at 5359 m.
#Cabinet approves two multitracking projects of Indian Railways in Jharkhand, Karnataka and Andhra Pradesh
This will increase the existing network of Indian Railways by about 318 Kms
The total estimated cost of the projects is Rs 6,405 crore
#CabinetDecisions
PM Modi laid foundation of 4-packages of Varanasi-Ranchi-Kolkata Expressway in Bihar yesterday:
🔸27 km package-2 (Sasaram)
🔸36 km package-3 (Sasaram)
🔸35 km package-6 (Aurangabad)
🔸33 km package-7 (Aurangabad)
👇starting point of the expressway in Chandauli, UP