@MarkGabbs The eaiser or more automated the front end is, the more complex the back end gets.
The lessons learned in the vcdx easily are applied at the application level where life cycle management is not built in with the VCF stack.
@MarkGabbs I was having a discussion with other VCDXs about this. Broadcom probably thinks that VCF 9 will remove most of the design decisions from the design or architecture but there is still lots to be made on the requirements, constraints, assumptions, AMPRS and up the app stack.
@GreggRobertson5 End of an era sadly. I figured this was coming when I noticed the vcdx directory went missing and the requirement for vExpert vcf keys require vcp-vcf
@anthonyspiteri Yet another dig at the cert program. It's already bad enough writing the vcaps or vcdx doesn't keep your vcp up to date. Why would anyone even bother with the vcp 8 exam ?
@PcPhilanthropy Honestly probably better then having to run 2 PSUs in the tower :p. Added bonus they likely wouldn't adjust the voltage choke on the GPU so the outlet power would cook it in 1-2 years which means more corp revenue :p
@mSykeCodes@nixcraft If you build it they will come, If you subscribe it they will leave. Ask BMW how their idea went on subscriptions for seat warmers.
@mSykeCodes@nixcraft This is what happens when execs that don't understand the product, technology, or customer basis try to make "decisions" to try and move the stock a point. Instead of focusing on what made them good in the first place and doubling down.