Watchlist • 9 July
The market is a little bit slow this week.
$EDGEUSDT waiting for setup near high.
$EVAAUSDT looking for setup near low or high.
$VANRYUSDT nice levels, looking for breakout setup.
#Binance#Trading $BTC $ETH $HYPE
Watchlist • 6 July
$LABUSDT good levels, waiting for local setup near high.
$TLMUSDT in nice uptrend, can comeback to the high, waiting for clear setup.
$VANRYUSDT active right now.
#Binance#Trading $BTC $ETH $HYPE
Weekly Recap • 29 - 5 July
✅3 trades
✅13.37% total
Super active week with solid pumps like $TLM, $TAIKO, $NFP. Didn't overtrade, but still locked in some decent profit. It would be awesome to catch some active coins this week. Let's see what it brings.
#Binance $BTC $ETH
$TAIKOUSDT on July 1st, there was a huge uptrend on this coin. I made some trades and one of the best was this short. There was peak volatility and I managed to take a nice, fast fake breakout move.
+9,23%
#Binance#Trading $BTC $ETH $HYPE
Watchlist • 3 July
$ZKPUSDT nice consolidation, waiting for breakout setup near high.
$MAGMAUSDT good 4h chart, waiting for local setup.
$TLMUSDT waiting for breakout setup to form.
$RIFUSDT good 4h chart, waiting.
#Binance#Trading $BTC $ETH $HYPE
Watchlist • 1 July
$NFPUSDT aggressive low liquidity pump. Can start a fast correction. Waiting for setup.
$BASEDUSDT waiting for setup near high.
$AIGENSYNUSDT good consolidation, looking for setup.
$RIFUSDT slow, but nice uptrend.
#Binance#Trading $BTC $ETH $HYPE
Watchlist • 29 June
$TACUSDT top active coin today. Can start an agressive correction. Waiting for setup.
$SYNUSDT setup on big timeframe. Waiting for local setup.
$ACTUSDT waiting for setup near high.
$SLXUSDT nice levels higher.
#Binance#Trading $BTC $ETH $HYPE
Weekly Recap • 22 - 28 June
✅2 trades
✅3.06% total
This week was slow again. $BTC is in a very tight range, which is why the market is a little bit slow and nice breakouts are rare. But that's okay anyway.
#Binance#Trading $ETH $HYPE $ZEC
Watchlist • 26 June
$BASUSDT still in an uptrend. Looking for a consolidation near the high.
$HEIUSDT nice consolidation, waiting for a breakout setup.
$AINUSDT waiting for a setup.
$SLXUSDT nice 1d level higher, waiting for a setup near the high.
#Binance $BTC $ETH $HYPE
$BASUSDT two good trades yesterday. The 1st one was a breakout trade, I saw consolidation and an uptrend and took a position with the take profit at a local high. The 2nd trade was shorting a fake breakout with a fast take profit.
+1.76%
+1.30%
#Binance#Trading $BTC $ETH $HYPE
Watchlist • 25 June
$BASUSDT nice uptrend, looking for 0.05 level.
$SYNUSDT still going up, looking for local consolidation.
$SLXUSDT looking for long setup near high.
$LABUSDT cosolidation is looking good, waiting for setup.
#Binance#Trading $BTC $ETH $HYPE
Watchlist • 22 June
$SYNUSDT Uptrend remains active. Waiting for consolidation or correction.
$IDUSDT good consolidation at current levels.
$ALLOUSDT nice levels higher up, maybe breakout setup will form.
$UBUSDT waiting for setup near highs.
#Binance#Trading $BTC $ETH $HYPE
Weekly Recap • 15 - 21 June
✅2 trades
✅3.93% total
It was a very slow week for me. A small amount of breakout trades. Maybe this week will be more active. #Binance#Trading $BTC $ETH $HYPE $ZEC
Watchlist • 19 June
$HEIUSDT top gainer today, waiting for some consolidation.
$BTWUSDT in uptrend. Waiting setup near highs.
bitcoin:native moving towards lows. Waiting for short setup.
$SYNUSDT huge 170% uptrend. Waiting for decent setup.
#Binance#Trading $ETH $HYPE $ZEC
Watchlist • 17 June
$SPCX good consolidation. Waiting for long setup near 225-228.
$BSBUSDT waiting for setup near 0.6 level, maybe fake breakout and short.
$IDUSDT nice breakout, can go higher.
$VELVETUSDT waiting for short setup near 0.3 level.
#Binance#Trading $BTC $ETH