$BTC: Decisive closure today !
We absolutely NEED to close above the trendline and over the DLY (20.5k$) Kijun to expect something to that move.
I'll call the comeback of a bullish trend when the LS confirm the TL breakout (~22k$)
#BTC#BITCOIN#TA#Crypto
$BTC: Driven by the RSI divergence, we are going straight to the major trendline in place since April 2022.
Note that it could be a major reversal with the DLY Kijun on the same point.
#Bitcoin#Bullish#cryptocurrency
$BTC: Today, we made the test of the DLY kijun. That test ended as a bearish signal. We are still under the influence of the trendline.
However, we can still see the light in a divergence from the RSI that may lead us to the trendline at 20.5k$.
#Bitcoin#Crypto#trading
Looks like the #USD is the only fiat able to be an hedge against Its own.
Also the best trade on a yearly scale for #FOREX traders #inflation
Source :@BenBakkum
$ATOM: After hitting the top of that canal, prices are now fighting with the bottom. We are also stuck in between DLY tenkan and DLY kijun, meaning that we're are still in a healthy correction. If we go below the canal, the LS still need to validate the signal.
#cryptocrash#BTC
🟢 $BTC: The volumes are here today ! only 12h of trading that day and 19.2k BTC circulated between all the exchanges.
TP1/2 (green),SL (red) and more infos on chart.
Peoples are coming back to the market chaps.
#Bitcoin#Crypto
$TOTAL crypto marketcap: After a massive breakout on the twist, the global #crypto marketcap is now at the technical frontier (SSB DLY) between a potentiel bounce or the 5th wave of the A mentionned by Romain at 16.5k$. I invite you to take a look at that Eliott wave theory.
$OSMO: Working in the 1.20/1.25 area which is the spot between both DLY Kijun and Tenkan. In the case of a breakout from the Kijun, we could expect a jump to 1.50$ (SSB FLAT). However, if we don't get that breakout, a RSI divergence is looking at us, target at 1.06$.
@osmosis
$EVMOS: Here are some objectives for the prices given by the #Fibonacci extensions. 0.618 is the main target at 2.9$. The 1 is the final target of that moove.
Be careful about a potential double top at 2.9$ even if volumes are here.
#evmos@EvmosOrg#Crypto
$AVAX: The breaking test of the cloud has failed, @avalanche_fr is now fighting with the Trendline. If that breaks too, we still have the LS to support the prices at 17.5$ for a potential double bottom.
@avalancheavax
#Crypto#avax
From a longer POV, the Eliott waves shows us that we are missing the fifth wave. Usually, the fifth wave represents 100% of the first wave. In our case, it means 15k$.
Here is the Eliott wave theory applied to the chart down below.
(2/2)
#eliottwaves#technicalanalysis
$BTC: September means comeback of the volume, but september also means the worst month for Risk-on assets historically. #Bitcoin is holding the 19500$ validating my TP from my last tweet. If it goes below 19.5k$, straight way to 17.5k (last low) and then 15k$
(1/2)
#crypto
$BTC: The hawkish terms said by #Powell turned all the market to a bloodbath...
The enormous red candle here is a strong signal to at least the last lows (~19k$). Be safe and wait for the market to price those news, we could ofc expect a weak bounce in the beginning of tomorrow.
$BTC: Todays closure will indicate if we falls back to below 20000$. #Bitcoin have to get back over the trendline to at least expect a range. between 21500$ and 24500$ (into the cloud).
#cryptocurrency
$ATOM: Here we already are, visiting the $10 area as i said here. That was a fast fall. Volumes are here.
Support at $10.5 (DLY kijun), $10.1 (LS+Tenkan) and below $10 we have another suppprt at $9.4.
#cryptocurrency#ATOMUSDT#Cosmos#BITCOIN