Sometimes the best thing to do when you are growing your #marketshare is to tell to your potential customers why and how you are different! So, we decided to do just that!
Learn about our #mobileapp & #software capabilities!
https://t.co/JL2JIIts3x
Your 3D printed clip snaps once, then cracks on the third opening.
Usually the root strain is too high. Lengthen or taper the arm, print it flat, and plan the undercut early.
Snap fit design guide with the math.
Sodium-ion hit GWh-scale production in 2026. Before your prototype switches: new voltage window, new cutoffs, new BMS settings, its own shipping rules.
Worst case says the lid hits the part. RSS says it clears.
For 3 prototypes, which do you trust? A worked tolerance stack-up example, plus 3 ways to fix a failing stack.
What a new product costs to develop in 2026 depends most on complexity: one part, or a multi-subsystem build.
We have not published 2027 prices. The outlook uses public BLS and Fed data, not a new price list.
Physics AI is shipping: agentic board checks, AI surrogates with out-of-range warnings, an 18-hour chip simulation run in 41 seconds under specific test conditions.
Use it to rank designs. Still build and test what decides if the product works.
A PCB design review checks the schematic, layout and fab files before you order prototype boards. Errors are still cheap to fix in CAD.
ERC and DRC are required but not enough. AI flags are vendor claims; an engineer verifies each one.
New nine-tool and four-nozzle desktop printers landed 3 Nov. Tool changes are down to seconds. Purge waste is lower but not zero, and real speed gains are modest.
Print looks-like and feels-like prototypes in-house. Send out bond, sealing and tight-tolerance parts.
Working prototype. Now: limited-life aluminum mold or hardened steel?
Our soft tooling vs hard tooling guide covers when each makes sense, a pre-order checklist, and why to confirm material and tool life with your molder.
Firmware that works on your desk can still fail at low battery or mid-update. How we test firmware on hardware prototypes: SIL vs HIL, a small HIL bench, test automation, and where AI test cases help.
This week: OpenAI Astra hardware demo (3 Nov) + WOGO drawing-to-CAD agent (5 Nov).
AI shortens drawing/STEP to editable CAD. It still does not own tolerances, DFM, or the first physical test.
Checklist:
From 18 Feb 2027, EU products with portable batteries must let users swap the battery with ordinary tools. No proprietary tools, heat or solvents.
New Oct 2026 exemptions cover some wearables and e-toys, but none can be sealed for life.
Decide battery access before tooling.
One prototype passing on a bench is not twenty units passing the same test.
Test fixture design for prototypes and pilot builds: when a fixture is worth it, pogo pin vs bed-of-nails, 3D printed fixtures, and where AI helps. Guide in the reply.
Building hardware with AI inside for the EU? High-risk rules moved to 2027 and 2028, but the AI disclosure rule has applied since August 2026.
What to build into the prototype now. Guide in the reply.