Lithium X2 (TSXV: LIXX | OTCQX: LIXMF | FSE: 9WI) has filed the PFS technical report for the Nevada North Lithium Project in Elko County, Nevada: US$9.81B after-tax NPV (8%), 23.6% IRR, 42-year mine life.
Well said, @bpaesbraga. Cost overruns are common in lithium projects, but the long-term case for domestic clay supply remains strong.
Nevada clay projects like Thacker Pass and our Nevada North Lithium Project (Elko County) can deliver large-scale, on-site battery-grade lithium carbonate on U.S. soil. This reduces reliance on foreign supply as Chinese inventories tighten.
Our PFS shows ~92,250 tpa average production, US$4,719/t operating costs, and solid economics over a 42-year mine life.
$LIXX.V $LIXMF
@globallithium is a well respected and extremely experienced voice in the lithium space. I personally share his long term view of lithium prices and large scale lithium clays being a solution to US domestic supply.
If you own a lithium stock, you're red-hot angry right now
And you have every right to be
After coming out of a multi-year coma, stocks shot up near vertical earlier this year.
You rode them up through the spring, and by November here they'd handed the whole year back.
And more...
China’s lithium carbonate inventories have now declined for 27 of the past 29 weeks and sit below 19 days of supply (SMM data via @matt_fernley).
This is among the tightest physical market positions in recent years. Sustained destocking, even during periods of rising weekly production, indicates that offtake continues to outpace available material. Low days-of-supply levels have historically preceded periods of stronger pricing in battery metals, even when futures remain range-bound.
For the broader lithium ecosystem, ongoing Chinese inventory tightness underscores the strategic value of diversified, non-Chinese supply. Long-life Western projects that can deliver reliable material help reduce concentration risk as EV and energy-storage demand continues to grow.
Data: SMM / @matt_fernley.
$LIXX.V $LIXMF
American lithium, from America’s mining state.
Nevada: #1 in the world for mining investment attractiveness (Fraser Institute, 2025) and America’s top gold producer for 40+ years.
The Nevada North Lithium Project is in Elko County.
$LIXX.V | $LIXMF | FSE: 9WI
From surface.
4,700+ m strike length, open to the south and east.
30.6 m at 4,196 ppm Li from surface in NNL-037.
A 0.88:1 life-of-mine strip ratio.
$LIXX.V | $LIXMF | FSE: 9WI
Lithium X2 has filed the NI 43-101 Technical Report for the Nevada North Pre-Feasibility Study.
Now on SEDAR+, with no material differences from the PFS results announced October 2, 2026.
🔗: https://t.co/1pt8ilE4WO
🇨🇦 $LIXX.V | 🇺🇸 $LIXMF | 🇩🇪 #9WI
The Nevada North Lithium Project.
A Mineral Reserve grading 3,928 ppm Li, a 42-year mine life and ~92,250 tpa of lithium carbonate,
$LIXX.V | $LIXMF | FSE: 9WI
Chairman Graham Harris explains how Phase 1 capital came in at US$2.77B in the Pre-Feasibility Study, 6.7% below the 2025 PEA.
$LIXX.V | $LIXMF | FRA: DJ5
Surge Battery Metals Inc. is now Lithium X2 Mining Inc.
Shares now trade as LIXX on the TSXV, replacing NILI, and as LIXMF on the OTCQX. No consolidation and no action required from shareholders.
🔗: https://t.co/1pt8ilDx7g
🇨🇦 $LIXX.V | 🇺🇸 $LIXMF | 🇩🇪 #DJ5C
Albemarle’s Q3 update is a clear reminder of the underlying lithium fundamentals.
Global consumption +48% Y/Y through August vs. supply growth of only +34% Y/Y lines up with the inventory drawdowns we’ve been watching in China. When demand runs ahead of new supply, inventories fall. That’s basic market mechanics.
Inventory draws and demand outpacing supply growth are the signals that matter for the longer term.
$NILI.V $NILIF
Quote from $ALB Q3 results..."Global lithium consumption up 48% Y/Y through August, outpacing global lithium supply growth up 34% Y/Y" That seems to tally up with the inventory reduction we've seen...which then asks the question - why the fall in prices?
Surge Battery Metals is becoming Lithium X2 Mining Inc.
Shares are expected to trade under the new name on or about November 9, 2026. The new symbol and CUSIP will be announced once confirmed.
🔗: https://t.co/mcYwNfHnIC
🇨🇦 $NILI.V | 🇺🇸 $NILIF | 🇩🇪 #DJ5C
"This is an American asset… a tier one resource asset."
Brian Paes-Braga, co-lead of Surge Battery Metals' Strategic Advisory Board, on the Nevada North Lithium Project.
→ 4.56 Mt LCE Mineral Reserve
→ 3,928 ppm Li Mineral Reserve grade
→ 42-year mine life
→ ~92,250 tpa average annual production
https://t.co/Qi9dbszTjn
Views expressed are his own; Mr. Paes-Braga co-led the Company's June 2026 strategic financing.
$NILI.V $NILIF
The 2025 drill program at the Nevada North Lithium Project: nine holes, 1,412.6 metres, including 116.0 m at NNL-030 and a 640 m step-out at NNL-037.
→ 4.56 Mt LCE Mineral Reserve
→ 42-year mine life
→ ~92,250 tpa average annual production
$NILI.V $NILIF
Chinese lithium carbonate inventories below 3 weeks of supply are another clear signal that the surplus is gone and the market is tightening.
This is exactly why new, high-grade domestic supply matters. Nevada North is advancing a 3,928 ppm Li mineral reserve with a 42-year mine plan, life-of-mine operating costs of US$4,719/t carbonate, and an after-tax NPV of US$9.81B.
Secure North American production is needed as inventories draw and EV + storage demand continues to grow.
Make sure to follow @matt_fernley for your Lithium Analysis.
$NILI.V $NILIF
Chinese lithium carbonate inventories continue their fall...now less than 3 weeks of supply, even for the restated series...In my view it's only a matter of time til prices bounce...
The Nevada North Lithium Project.
→ 3,928 ppm Li Mineral Reserve grade
→ 4.56 Mt LCE Mineral Reserve
→ 42-year mine plan
→ 99.95% battery-grade lithium carbonate
→ US$9.81B after-tax NPV8%
Drilling for the Bankable Feasibility Study is under way.
$NILI.V $NILIF