🚨 Wallet update from @SUPRA_Labs
$SUPRA (ERC-20) is coming to @MetaMask in the next few days!
This will make access and usage of the token much easier for everyone already in the EVM ecosystem.
After SupraNova 360° (bidirectional bridge now live), another usability step:
MetaMask support = • Easier onboarding • More visibility • Native experience for users of the most popular Ethereum wallet
And the team already confirmed: more availability updates across the ecosystem are coming soon.
Infrastructure is being built and distribution is too.
$SUPRA is becoming more accessible every day. Coming soon to MetaMask 🦊 × 🔴
$SUPRA looks like it’s about to make another ATL.
Still holding ! But it looks bearish in short term.
Day 122 posting $SUPRA until it makes a new ATH 💎
Supra Containers Can Grow With Your dApp
1/5
Not every dApp needs massive infrastructure from day one
Sometimes you start small
A few users
A small community
A simple product
The problem is making sure your infrastructure can grow when the users arrive
@SUPRA_Labs $SUPRA 🧵👇
$SUPRA coming to @MetaMask ?🦊
That’s not just good news for $SUPRA...
That’s seriously bullish for $Suprabag 🎒.
More access.
More eyes.
More people discovering the Supra ecosystem.
And you already know what happens when more people discover the bag...
They start asking:
‘Where can I get one?’ 👀
The fox sees the bag.
And the fox is bullish. 🦊
Supra ( $SUPRA) has been shipping!
What has Supra ( $SUPRA ) accomplised since mainnet launch:
Supra ( $SUPRA ) is a vertically integrated MultiVM Layer-1 blockchain focused on Automatic DeFi (AutoFi), with native oracles, automation, randomness, and cross-chain messaging. Its public mainnet (MoveVM) launched in November 2024 alongside the $SUPRA TGE.
1. Core Infrastructure (Live/Operational)Supra L1 Mainnet (MoveVM): High-throughput Layer 1 with ~500,000 TPS potential, sub-second finality, and Moonshot Consensus (formally verified aspects). Move smart contracts are fully live. MultiVM support includes Move on mainnet; EVM is available in limited/testnet alpha (full mainnet composability in progress); SolanaVM and CosmWasm are planned.
2. Native Oracles / Data Feeds:
500–600+ price feeds (crypto, RWAs, equities, commodities, and more) with fast refresh rates. Push- and pull-based models serve Supra and 90+ external chains.
3. dVRF (Distributed Verifiable Random Function / on-chain randomness):
Operational and widely used, with millions of requests delivered across chains.
4. Native Automation (system-level, zero block-delay):
Live on public mainnet (launched around June–July 2025). Enables on-chain if/then logic, scheduled executions, liquidations, rebalancing, yield harvesting, and more without external keepers.
5. AutoFi platform:
User-facing (AI-assisted/no-code) interface for building and running automation strategies/templates. Live on mainnet (https://t.co/0I0a7haVJy).
6. Cross-Chain & Liquidity Products:
SupraNova (L1-to-L1 cross-chain communication / bridge):
Forward direction (Ethereum → Supra, lock-mint of assets like ETH/USDC as wrapped versions) live since ~August 2025.
Reverse direction (Supra → Ethereum, including native $SUPRA as ERC-20) live on mainnet as of August 18–19, 2026. Uses HyperNova (trust-minimized consensus proofs from the source chain rather than third-party validators) and supports HyperLoop for certain cases. Interface at https://t.co/MGsCGjI0oi.
7. iAssets / PoEL (Proof of Efficient Liquidity):
Multi-asset liquid staking protocol. Users bridge assets (e.g., ETH, USDC, WBTC), mint yield-bearing iAssets (iETH, iUSDC, etc.) that earn dual rewards (staking + DeFi utility) while providing network security/liquidity. Mainnet contracts are live; it has seen reported TVL and integrations (e.g., with lending protocols). Reverse/redemption flows advanced with the bidirectional bridge.
8. Other Shipped/Operational Items:
StarKey Wallet: Official wallet (with updates for custom networks, NFTs, swaps, bridges, and more); hundreds of thousands of wallets created.
9. Fiat onramp: Integrated with Banxa (shipped as part of 2025 rollouts).
10. SupraScan: Block explorer (https://t.co/s0QG0XI9m6, with MultiVM support in progress).
SupraOS: Self-hosted, blockchain-enforced AI agent platform (alpha released ~April 2026, limited cohort operational with on-chain rule enforcement).
11. Supporting features from rollouts:
Includes elements like SupraLiquid/FTO (Fused Token Offering model for ecosystem projects/community value sharing) and PBO 2.0 (part of mid-2025 shipping announcements). Ecosystem dApps (e.g., lending like Supralend, prediction markets) have also launched on the network.
Supra emphasizes vertical integration (oracles + automation + bridging + execution in one stack) for AutoFi and AI-agent use cases. EVM full mainnet, additional chain integrations, Threshold AI Oracles (TAO) mainnet, SupraLiquid (perp DEX) full launch, and further MultiVM composability remain in progress or testnet phases as of the latest available updates.
@SUPRA_Labs #Supra #AutoFi #Crypto #Layer1
It's really take effort to really take build a well structured and standard project that's where $SUPRA comes
No hype just pure frame work and transparent society infrastructure
SUPRA x MetaMask Coming Soon
Supra has announced that $supra (ERC-20) support is coming to MetaMask within the next few days, making it easier for users to access and use the ethereum:native version of Supra directly through the wallet.
This follows the recent launch of SUPRA's reverse bridge to Ethereum and marks another step in expanding Supra beyond its native ecosystem.
Supra also says:
“More ecosystem availability updates will follow soon.” 👀
Native SUPRA → Ethereum → ERC-20 Supra → MetaMask → what comes next?
Could we eventually see expansion to binancecoin:native Chain or other EVM ecosystems? Nothing has been confirmed, but as $SUPRA becomes available beyond its native network, it's certainly something I'll be watching.
The cross-chain story is starting to get interesting. 🔥
⚠️ Disclaimer: This post is for informational purposes only and includes personal observations and speculation. BNB Chain or additional EVM network support has not been confirmed by Supra. This is not financial or investment advice and should not be considered a recommendation to buy, sell or hold $SUPRA or any other asset. Crypto assets are highly volatile and carry significant risk. Always verify developments through official sources and do your own research.
Wallet availability update:
$SUPRA (ERC-20) support is coming to @MetaMask in the next few days, making it easier for users to access and use $SUPRA through the wallet.
More ecosystem availability updates will follow soon.
@ScottiePippen supra:native is the Chicago Bulls mid 1980's... right before the franchise's legacy lit 🔥
But as with anything, you gotta put in the work to realize that and have the needed conviction to capitalize on it early.
You're a champion @ScottiePippen, so you can do it!! 🏆⚡️
$SUPRA needs to show strength now. While altcoins and nearly the entire market are pumping, SUPRA keeps falling behind. If buyers don’t show up even in these conditions, the project risks losing the community’s trust. It’s time to deliver
#SUPRA#Crypto#Altcoins
Why #SUPRA’s Oracle Infrastructure Matters 🧠⚡
A blockchain can be fast and secure, but smart contracts still need reliable information from outside the chain.
That’s where oracle infrastructure comes in.
@SUPRA_Labs is building a decentralized oracle network designed to deliver verified real-world data to blockchain applications.
Think about it:
🌍 Real-world information
↓
🔐 Data verification
↓
⛓️ On-chain delivery
↓
🤖 Smart contracts make decisions
This can unlock better infrastructure for DeFi, gaming, prediction markets, RWAs and other Web3 applications.
The bigger picture?
Web3 needs more than blockchains. It needs reliable data infrastructure connecting those blockchains to the real world.
That’s the problem #SUPRA is working to solve. 🚀
#SUPRA #SUPRALabs #Web3 #Blockchain #Oracle