Cornerstone Limited was founded in 2004. We are experts in EWI Installations, & have access to funding direct from Energy Suppliers for ECO and The Green Deal.
CASE STUDY: Cornerstone secured this complex high rise refurbishment project with social landlord Accent Housing in early 2022 via competitive tender. The contract focused on the predominantly external upgrade of two tower blocks ��� Stafford House and Alexander House.
The works were delivered to a high standard in compliance with our programme of works and to the complete satisfaction of our client. The visual transformation of both blocks was matched with improvements in both safety and energy efficiency.
Our race team won two trophies at the Caterham Seven UK Championships (amateur class) at #Snetterton Circuit this past weekend! We picked up 1st and 3rd place trophies. Here are some photos of the Cornerstone Caterham in all it’s glory!
#snettertoncircuit#externalwallinsulation
Mr Chairman!!!
The man who made this all possible.
The commitment shown to growing the football club and hard work bringing the community together has been wonderful.
Sponsors player of the season.
The @LtdCornerstone player of the year was @JoeManning10.
Didn’t matter if it was CM, CB or even a 30 minute cameo at RB, week in week out Joe has been so consistent and thoroughly deserved this award.
Well done Joe 🖤🖤🖤
Congrats to the U13 boys team. Winners of the Charles Harvey Trophy. Worthy appointments @DartfordSchFA Having lots of fun on the coach back to Brighton. What a team! Huge appreciation to @LtdCornerstone for supporting us this season.
Great news. Our U13 boys are through to the final of the Charles Harvey Cup after a thrilling win (6:1) against Thanet SFA. Goal scorers were Freddie (2), Callaum, Noah, Ethan & Isaac. Player of the Match was Roman. Congrats to all, and appreciation to @LtdCornerstone
We completed our element of the works in 2022, having worked on the nine blocks concurrently at the peak of the scheme. The EWI was applied to walls, balconies, walkways and external staircases across the three and four storeys buildings. (3/3)
Cornerstone was appointed by main contractor United Living to complete insulation works to nine medium rise residential blocks for end client the Royal Borough of Greenwich in 2019. (1/3)
We worked closely with our manufacturer partners to develop appropriate design details for each block; due to the nature of their construction, a significant amount of detailing was required to meet planning requirements. (2/3)
The scheme was delivered across four locations in Guildford borough in 2020 and 2021. A total of fifteen properties were externally insulated, including three groups of Swedish timber framed properties. https://t.co/TANMlXORMX (3/3)
Cornerstone was appointed by Guildford Borough Council to deliver a programme of #externalwallinsulation to properties within their housing stock, as their budget allowed. Successful via an open tender process, we were appointed in early 2020 & commenced work in the Spring. (1/3)
Cornerstone worked with our supplier partners to develop technically appropriate solutions for each property type. For the Swedish timber framed properties, this included stripping and strengthening the existing timber prior to the application of the EWI system. (2/3)