@calahonda4@KieranOCarroll2 It varies hugely tbh. In or about โฌ100 a metre to buy depending on quantities. In or about โฌ100 a metre erected includes concrete digger hire and labour.
@jimmythemink@KieranOCarroll2 It doesnโt need to be concreted in it can be just driven into the ground. We find it better to concrete each hole. No trench needed
@KieranOCarroll2 It really does depend on quantity and conditions. We concreted in every pole and was on a hill and a curve. So slower than a straight line.