Experts in Heavy Lift & Heavy Transport Project Management, Engineering, Contracting & Consulting. MAC Heavy Lift provide innovated solutions for your Projects.
Flashback.
Gooseholme Park receives its new foot & cycle bridge.
A 1000te Mobile Crane was brought into the Kendal Park to lift the bridge that had been delivered in sections, into final position
The largest crane ever to visit the centre of Kendal!
https://t.co/JNTcpnRoYD
Heavy Lifting at the Port of Ayr. Discharging a Super Grid Transformer from a vessel at ABP Ayr.
Using a Liebherr LTM1800d from Baldwins Crane Hire, the SGT was discharged direct to the trailer of Skelmersdale based JB Rawcliffe.
Phone : 0808 188 9009 #HeavyLift
The weekend means a break for some. For Heavy Lift Infrastructure Projects, it is 'all-go'.
MAC Projects and MAC HeavyLift offering multimodal project solutions, including SPMT and Heavy Cranes.
Project support from day one.
@MAC_HeavyLift@HeavyLiftHQ
Using a Liebherr LTM1800d, a Super Grid Transformer was discharged at ABP Port of Ayr.
MAC Heavy Lift were delighted to conduct the lifting assurance on this particular Heavy Lift and look forward to the other impending discharges.
Supporting Heavy Lift Projects around the world. With decades of experience and a solution to every challenge, MAC Heavy Lift are here for your next Project.
A 333te Siemens Transformer is discharged from a Heavy Lift Vessel at the Port of Dover using the ships gear.
Heavy Lift design, assurance and operational delivery!!
Making Light Work of a Heavy Lift off Duke Street in Glasgow.
The mighty 650te Liebherr Crane showcasing its capabilities, lifting the electrical transformer from a street adjacent to the substation.
Together with our delivery partners, each week we demonstrate our attention to detail and execute projects in a safe and quality driven manner.
In this instance, working on a SPEN project near Edinburgh, we were engaged in advance to provide details…
200% Leaner in an operational and commercial sense (than Jacking & Skidding), saving the client and programme 66%.
🟩 [email protected]
🟩 https://t.co/6HXMKklXYQ
🟩 0808 188 9009
The aerial images are representative of a double transformer installation that was 'not possible' by mobile crane and required Jacking and Skidding. The engineered solution allowed for both Transformers to be installed in a single shift.
Working on behalf of our Clients, delivering safe and economical project solutions. Quality driven installations that help save programme time. Which in turn, allows our ever-busy Clients to streamline their own engineering resource. Accomplishing more, together.