The #CloudiFacturing project will start next year with an interesting proposal of #DigitalMarketplace.
Want to take a look and find out how can it help your #SME ?
Click the link to find out!
https://t.co/89scrGYBVQ
The 1st @CloudiFacturing Open Call, was very successful; around 40proposals were submitted, with consortia composed by various type of organizations. STAM, as DIH, is proud to have supported 10 of them.
Looking forward to the next one, that will be opened in July 2019!
It was a night of learning and discoveries that made me realize how much UX design (and a scientific/schematic approach to design!!!) can not only facilitate, but improve engineers' work. Thank you @caweena !
I'm exhilarated from speaking with all the designers after our design panel tonight @UCBerkeleyIntl Thanks for all your thoughtful questions! One of the best compliments was from a robotic engineer telling me he wants to get into design after this.
It was FUN! Seeing our software being used in REAL buildings by relevant stakeholders was a great productive experience. More training sessions to come, the next one will be next week in #Budapest hosted by #ABUD and chaired by myself! https://t.co/WxXm49odv4
Yesterday we held our final conference at @sustainplaces The event allowed us to present the main project results & to contextualize them in the framework of European activities in the field of collaborating smart grids, construction actors, and forward-thinking communities.
Tomorrow join us at NewTREND final conference from 8.30 a.m. to 12.00 p.m. at Sustainable Places (Aix-Les-Bains, France; 27-29 June 2018)! https://t.co/lp5Bqcb3hF
As we approach the end of the project we will be at SP18 (https://t.co/KSG57grS12) to present our results. Meet us at 8.30 on June 28th, 2018. Aix-Les Bains, France. https://t.co/VRCkD2SrNH
Si chiama @Stream0d e viene presentata come una soluzione che consentirà alle industrie di abbattere drasticamente il margine di errore e ottimizzare la produzione. https://t.co/Bfhom6W9HB
Nuestro responsable del equipo de Programas Colaborativos de I+i, José Ramón Valdés, que coordina el proyecto europeo, de la convocatoria H2020, @Stream0d para la fabricación sin defectos, ha sido entrevistado por la revista
https://t.co/STmuSV8rcR
Yesterday #I4MS Project Manager, @MashaRoca, attended a local event in #Valencia as part of the Code Camp Valencia at @Inn_Somnia.
The available opportunities for the #SMEs in the @CloudiFacturing project were presented. Discover more about them here: https://t.co/Yf2Ho6yaK2