The guys are racing to get undergrounds completed at the Terpstra families new rotary project before winter hits next week. This project includes a 800 cow wide body partial neutral pressure tunnel barn, DLS sand lane, Jourdain stabling, & a Flush system for the holding areas.
All cleaned up on this fertilizer blending facility in Amberley by @schoondbros. Taking advantage of some December heat today to strip 750 feet of wall, patch and seal. @OntAg
Something a little different today on this digester project. 220 meters poured on the slope for the first time in this part of @ontag by @schoondbros. Exciting to see this project come together!
40 days ago the footings began and as of today structural concrete is complete for this massive cross-vent dairy by @schoondbros and ready for framing. With how wet this fall has been, that’s moving! @AloraDesignsInc#agconstruction
Maiden voyage for this multi purpose tank at #NuhnIndustries by @schoondbros. This tank serves as a SWM pond, fire pond, and test track for the lagoon crawlers. In addition to fire protection for the new warehouse, this pond will assist with rural fire water supply @OntAg
STOLEN - Millroad Aluminum deck over trailer. 16’ Long. Plated T9991D. Sometime between last night Friday September 29 and this morning. Had 3 man doors for a shop on it as well. Contact us if sighted. Retweets Appreciated
STOLEN - Millroad Aluminum deck over trailer. 16’ Long. Plated T9991D. Sometime between last night Friday September 29 and this morning. Had 3 man doors for a shop on it as well. Contact us if sighted. Retweets Appreciated
They were there when the building came down and they are there today pouring the footings for this shed re-build project. @mccannredimix@OntAg@ONCornFedBeef