Work has started on site in Poplar for the Blackwall Reach Regeneration Project. Demolition and piling are now complete with the basement currently under construction, and technical design of the prefabricated façade is ongoing. https://t.co/EykWCj7CPb @Met_Work
Delighted to see Kenwood Lee House featured in @RIBAJ, described as “a quietly impressive family home with a relatively restrained street elevation that belies the more radical moves within”. Read the full article https://t.co/E328jn0vkB @NewWave_London@FormSD@smarthomelondon
MWL Group were invited to form part of a design team for Swaines Lane to realise a complex architectural intent from concept development through to practical completion. Find out more about this project here - https://t.co/x0qSGHlxvf #london#engineering#engineeringproject#rt
Find out all about the project MWL Group worked on, which included planning & detailed design works associated with #development of 70 dwellings, #restaurant and #commercial office space.
You can find out all about the project here → https://t.co/aJirXD7DyR #engineers#property
MWL Group worked on the 613-bedroom hotel located within #Heathrow Terminal 4. The services we provided included energy strategy development, SBEM calculations, CHP analysis and design plus many more.
To find out more about the project, visit ➡︎ https://t.co/gJSbZsYZKO
#london
In 2010, we formed part of a design team to assist in the refurbishment and extension of an existing Grade II listed office into a 98-bedroom hotel and conference facility - the #TownHallHotel
Find out more about the project here ➡︎ https://t.co/OvMU650I6I
#BethnalGreen#LDN