Hi, I’m Michael Liu from Yinuo Tech.
We help global buyers source network hardware:Cisco/Juniper/Arista/Huawei/Fortinet
Routers, switches, servers, firewalls and spare units.
We support
- SN/condition checks
- Careful packing
- HK/China export coordination
DM me for availability
For 400G/800G deployments, optics and cabling are part of the architecture, not an afterthought.
Validate port/breakout, FEC/NOS, reach/fibre, power/airflow, test scope and lead time before committing.
#400G#800G#Optics#DataCenterNetworking
For 400G/800G projects, a switch model alone is not a deployment plan.
Validate port breakout, optics/cabling, airflow/PSU, software, destination, lead time and test scope before procurement.
#AIInfrastructure#DataCenter#400G#800G
Several Mellanox/NVIDIA SN5610 switches are expected to arrive by the end of September.
For 400G/800G projects, please qualify port breakout, optics/cabling, airflow/PSU, software, destination, lead time and testing needs early.
#SN5610#Mellanox#AIInfrastructure#DataCenter
A model number alone is not a complete network-hardware requirement.
SKU/config, qty, condition, ports/optics, airflow/PSU, software, testing, destination and lead time determine whether a project route is actually workable.
#EnterpriseNetworking#DataCenter#NetworkHardware
A matching part number is only the start. Config, ports/optics, airflow/PSU, software, test evidence, destination and lead time decide whether network hardware is actually deployment-ready.
#EnterpriseNetworking#DataCenter#NetworkHardware
A matching part number is only the start. Config, ports/optics, airflow/PSU, software, test evidence, destination and lead time decide whether network hardware is actually deployment-ready.
#EnterpriseNetworking#DataCenter#NetworkHardware
For a deployment, a switch being available is only step one. SKU/config, ports/optics, airflow/PSU, software, testing, destination and lead time decide whether it is actually usable.
Arista DCS-7060CX3-32C-R and DCS-7010TX-48C-R are available for defined requirements.
#Arista
Model number is only the start.
For Arista DCS-7060CX3-32C-R / DCS-7010TX-48C-R, a workable project needs config, airflow/PSU, optics, software, testing, destination and lead time aligned.
Both platforms are currently available. Send the exact requirement.
#Arista#DataCenter
AI infrastructure planning should not end at deployment.
When platforms refresh, the next question is whether hardware can be redeployed, tested and refurbished, recovered for components, or responsibly recycled.
The highest-value next use matters.
#AIInfrastructure#ITAD#Data
Arista sourcing update:
Confirmed availability for project review:
DCS-7060CX3-32C-R
DCS-7010TX-48C-R
For active requirements, send qty, condition, destination and target lead time. We will confirm a workable configuration and delivery route before quoting.
#Arista#DataCenter
Project-ready is different from merely in stock.
Before export, we verify the exact SKU/configuration, airflow and PSU direction, accessories, test evidence, packing, destination requirements and lead time.
That work turns hardware into a deployable option.
#NetworkHardware
Arista availability for defined project requirements:
DCS-7060CX3-32C-R
DCS-7010TX-48C-R
Physically in stock and available for sale.
Send model, qty, condition preference, destination and lead time. We will confirm configuration, testing and delivery feasibility before quotation.
Before a switch is usable for a project, verify configuration, optics, airflow, PSU direction, software path, condition, test evidence and destination requirements.
That is what turns an available unit into a deployable solution.
#Arista#Networking#DataCenter
Fresh inbound enterprise networking hardware is moving into inspection and project-delivery preparation. For project sourcing, a part number is only the start: model, condition, testing evidence, destination and lead time determine more.#EnterpriseNetworking#DataCenter#Juniper
Received today: 19 x Juniper QFX5120-48Y-AFI2.
A fixed 1U data-centre leaf platform with 48 x 1/10/25GbE SFP28 ports and 8 x 40/100GbE QSFP28 uplinks. AFI2 means back-to-front airflow, a detail worth confirming early in every deployment plan.
#Juniper#QFX5120#DataCenter
For EOL or hard-to-source network hardware, “available” does not automatically mean “deployable.” Validate ports, airflow, PSUs, software path, optics/cables, condition, test evidence and delivery plan before proposing an alternative. #Arista#NetworkHardware
A model number alone is not a complete network-hardware sourcing brief.
Qty, condition, test scope, destination and target lead time all affect sourcing, compatibility, packing and export planning. Clarify them early, then compare like-for-like offers. #NetworkHardware#Juniper
Available does not always mean deployable. Before comparing network hardware offers confirm exact P/N and revision ports/speeds airflow PSU/fans software/license condition/testing destination and lead time. A small mismatch can delay the whole project.
A network hardware quote needs more than a model number. Confirm condition, testing, airflow, PSU/fans, optics compatibility, software status, destination and lead time. A cheap unit can become an expensive deployment delay. #NetworkHardware