What is happening, KE? No power all night in Johar Block 7. Are you saving fuel costs or is this your weekly punishment for the people of Karachi?
@KElectricPk@NEPRA5@SindhCMHouse@murtazawahab1
Respected Mayor Karachi,
Great to see progress on University Road & Pehlwan Goth Road.
Kindly repair the 3 arterial roads marked in red near Sachal Goth to ease Johar commute.
@murtazawahab1@sharjeelinam
We’re labeled “No Load Shedding” on the app.
But it’s alternate-day breakdowns and today = no power since morning.
Who’s updating the app, and who’s updating the grid?
Johar Block - 7.
@KElectricPk@NEPRA5
Block 7, Johar is OFF every alternate day for "maintenance".
Maintenance matters, but so does basic supply. Please arrange an alternate source instead of cutting the whole block. @KElectricPk@NEPRA5
First drop of rain and KE cuts power to the entire area for "safety". This doesn't happen in developed cities. Rain stopped almost 2 hours ago and we're still waiting for power to come back on.
@KElectricPk@NEPRA5
A small fault occurred when a crow touched the PMT wire, and the breaker tripped. This means the switchgear is working correctly. However, from 5:00 PM until now, no one has arrived to reset!!
400002359136
@KElectricPk
@KElectricPk Agreed. Maintenance is essential. We are suffering every week — please refer to the records. For planned maintenance, an alternate source of supply should be provided.
@NEPRA5
No power since this morning. This is a 'no load-shedding' area, yet there is no tie breaker or alternate source supply system in place. Please look into this. Johar Block 7!
@KElectricPk@NEPRA5
No power since this morning. This is a 'no load-shedding' area, yet there is no tie breaker or alternate source supply system in place. Please look into this urgently. Johar Block 7!
@KElectricPk@NEPRA5
Our area is listed as load-shedding free, but changes feeders every week for "maintenance" & puts us under heavy load-shedding. Share a clear schedule in advance. Residents deserve reliability + compensation for unscheduled outages. 400028222228 @KElectricPk@NEPRA5
What happened to K-Electric? In a no-load-shedding area they started load shedding, and now the power is turned OFF during on-schedule hours! JOHAR block 7.
@KElectricPk@NEPRA5
Power has been shut down across the entire area since around 12:30 AM. The estimated restoration time on the app has been increasing by 3 to 4 hours continuously. The system is poorly managed with no backup or tie breakers available to keep areas operational.
@KElectricPk@NEPRA5