[MUST WATCH]: MMC @MsaneThembi urges residents not to throw and dump items that do not belong into the sewer system, as this causes blockages that have a ripple effect, inconveniencing residents. #CoEWorks
MMC @MsaneThembi calling on learners to do more and not be tied down by peer pressure.
She also encouraged them to focus more on their studies and future plans, at the #Back2School programme at Charlotte Maxeke Secondary School.
A number of sewer blockage hotspots were identified and cleared. The aim is to at eradicate sewer spillages in the City to ensure a greener and cleaner Ekurhuleni.
❗️REMEMBER to report sewer issues to the call centre:
📞0860 543 000
📱My CoE App
@CoE_Call_Centre#CoEWorks
[MUST WATCH]: MMC @MsaneThembi during the Operation #SiyakhucululaManjeNamhlanje, explaining that encroachment is one of the challenges the City faces, when trying to locate a manhole to attend to a blocked sewer line. #CoEWorks
MMC @MsaneThembi has officially unveiled the upgraded Diens Street Substation in Ekurhuleni
MMC says they are committed to tackling the broader challenge of electricity blackouts by building additional generation capacity and exploring alternative energy sources #EFFInGovernment
MMC @MsaneThembi launched the upgraded Diens Street Substation in Ekurhuleni.
This project lays groundwork for integrating renewable energy sources, which will be crucial in diversifying our energy supply and reducing dependence on traditional power sources. #EFFinGovernment
MMC @MsaneThembi says the upgraded substation she has launched aligns with the vision of creating a sustainable and environmentally responsible industrial sector. #EFFinGovernment
MMC @MsaneThembi speaking at the launch of the upgraded substation in Alberton.
She says the decision to upgrade the substation was driven by the notable expansion of the area. The growth necessitated an increase in energy supply and modernization of existing infrastructure.
MMC @MsaneThembi launched the upgraded Diens Street Substation in Ekurhuleni.
This represents a crucial step forward in our mission to support and sustain the growing industrial demands of our region. #EFFinGovernment
[IN PICTURES]: MMC @msanethembi officially switched on electricity in Ramaphosa and Tokyo informal settlement today.
The electrification of these informal settlements is aimed at preventing criminality and to stop unnecessary electrocutions. #EFFinGovernment
🔺A Happening Tomorrow🔺
MMC ClIr @MsaneThembi will be officially switching on electricity at Ramaphosa and Tokyo informal settlement's tomorrow at 18h00
#EFFInGovernment
MMC Cllr @MsaneThembi will be officially opening the upgraded Diens Substation at Diens street Alrode, Alberton on Tuesday, 12 December 2023 at 10h00
#EFFInGovernment
MMC for Water, Sanitation and Energy in Ekurhuleni, councillor @MsaneThembi, who commissioned the Cossins Reservoir today, with HOD Thokozani Maseko. #EFFInGovernment
MMC @MsaneThembi with MMC for Waste and Environmental
And the member of Oversight Committee Msabeni Khumalo at the Commissioning of the Cossins Reservoir in Boksburg today. #EFFInGovernment
[IN PICTURES]: MMC @MsaneThembi has Commissioned Cossins Reservoir today.
This project is not just about constructing a reservoir; it’s about constructing a future where every citizen has access to the basic necessities of life. #EFFInGovernment
MMC @MsaneThembi delivering a keynote address at the Commissioning of the Cossins Reservoir.
Without water, clean and dependable water, and affordable, we can put the lives of our residents in danger. #EFFInGovernment
Councillor Sanele Hlongwane thanking the MMC @MsaneThembi for delivering services to the people, also calling on community members to take care of this newly commissioned reservoir. #EFFInGovernment
MMC @MsaneThembi extending heartfelt appreciation to everyone involved in the commissioning of the Cossins Reservoir project.
Concluding her speech she appealed to everyone to help build a “People’s Municipality” that stands as a beacon of hope and progress. #EFFInGovernment