Industry chatter, not a rule. Three AI-PCB pages this week: Trace (concept→fab package), Circuit Mind London (architecture→schematic+BOM), Quilter (physics place/route into your ECAD). Test: who owns the revision when the agent edited last night.
CAD outruns revision history.
PCB Studio
https://t.co/eiOUxeaW27
Atech — no wiring
https://t.co/qObLz0xUdP
Tykra Lab — Figma for HW
https://t.co/norBdKNVRP
External agent or box-copilot?
Day 11 building the Figma for hardware until somebody invests in it.
More and more we’re seeing personal devices, and one of the most important things is portability. Today I’m studying attachment systems: holes, metal eyelets, loops, bridges, recessed anchors and strap lugs.
The whole system is parametric, so I can change the opening, wall thickness, position, protrusion, materials and how each attachment becomes part of the device itself.
I like this one because carrying hardware sounds like a small detail, but it can completely change how a personal device is meant to live with you.
CRA reporting is live — ENISA’s SRP too. 24h/72h; AEV final ≤14 days after a fix or mitigating measure. No API at launch — last step is a person on a form. Products already on the market are in scope after 11 Sep. As at 14 Sep 2026.
FCC 26-50 Final Rule is in the Federal Register. Effective 13 Oct 2026: Covered List logic-bearing parts can block new device auth even when an EU shop designed the rest. Pending apps that day are exempt — until a logic-part amendment. Prior auth not revoked. As at 11 Sep 2026.
Industry chatter, not a rule. The AI-hardware noise is enterprise EDA agents. For a micro shop the test is agent plus KiCad (or a harness) that keeps schematic, BOM, and revision from drifting. If it cannot fail closed, it is a faster respin.
EU Cyber Resilience Act: reporting starts 11 Sep 2026, not only Dec 2027. CSIRT + ENISA via the single reporting platform. 24h/72h from becoming aware; final report ≤14 days after a fix is available. Covers in-scope products placed before 11 Dec 2027. As at 7 Sep 2026.
Canada RSS-Gen / RSS-310 Issue 6 is official (as at 31 Aug 2026). Issue 5 or 6 accepted until 30 Jul 2027, then Issue 6 only for new Canada filings and stock. Not a sudden cut-over.
3 Sep US drone tariffs: 100% over 25 kg, thermal, or docking; 25% at or under 25 kg without thermal. On Blue UAS or FCC Conditional Approval on 2 Sep, that date moves to 9 Feb 2027. As at 31 Aug 2026. None of the relief is automatic.
Two programmes, not one feature: wellness product ≠ clinical path. Price the second before the US slide promises diagnostic AI.
https://t.co/pKjO7DAUKM
As at 22 Aug 2026 three routes for Covered List UAS: Blue UAS; Buy American (65% US content through 2028); Conditional Approval via [email protected]. DJI and Autel excluded from the first two. CAs no longer auto-expire; Blue UAS/Buy American to 1 Jan 2028.
22 Dec 2025: FCC added foreign-produced UAS and critical components to the Covered List. As at 22 Aug 2026 that is still the position. New equipment authorisations are blocked. Already-authorised models are not pulled by that action. Allied manufacture is not an exemption.
I love a posh unboxing as much as the next person.
But sometimes it's the small details that stick. Our encrypted storage key from the US arrived with a handwritten note about Haaland and Norway. Cost nothing. Said everything. @apricorn_info. Ro Ro 🇳🇴
#DataSecurity#DeepTech
Read up - FDA News on Wearables.
I found the press session during CES 26 with FDA Commissioner Marty Makary interesting, read our take on what this means for the wearable industry tomorrow.
https://t.co/RYiYFSaNWd