Tightly managed logistics and teamwork are the key to orchestrating the
24/7 installation of the Nord Stream 2 Pipeline. See the full video here: https://t.co/sXae8V5Asj
The first of all steps to build an offshore pipeline is to conduct extensive surveys of the seabed. Find out more about the high tech surveys of the Baltic Sea: https://t.co/F6EzvgrySH
In the Bay of Greifswald, two pipeline ends were connected on pipelay vessel Castoro 10 in a procedure known as Above-Water Tie-In. Find out more about the highly complex welding process: https://t.co/DVKhhssFG1
More than 1,000 companies from 25 different countries are involved in the
construction of the Nord Stream 2 Pipeline, such as Europipe in Mühlheim,
Germany, where much of the pipe was produced: https://t.co/GaFSXlfm1o
The Bovanenkovo gas field on the Yamal Peninsula is one of Russia’s biggest natural gas production plants and a source of gas for the Nord Stream 2 Pipeline.
Before the Nord Stream 2 Pipeline makes landfall in Germany, the pipeline is buried in trenches in the Bay of Greifswald. Two 700-m microtunnels make the transition from the underwater section to the landfall. https://t.co/E9aG6rwP6N
After over 2 years of pipe production and processing, all Nord Stream 2 pipe coating activities have been completed. A big thank you to everyone involved in coating the amount of steel equivalent to 500 Eiffel Towers with concrete!
Clean rock material is placed before and after pipelay at dedicated locations along the route to guarantee stability in uneven seabed conditions, provide additional support at crossings with other infrastructure and to mitigate freespans
When surveying the seabed, we came across everything from shipwrecks to washing machines. Any time we discover a potential artefact, we work together with the relevant authorities. Get the full story here: https://t.co/FyLm2lRcXP
Thorough surveys are the cornerstone of offshore infrastructure projects. Nord Stream 2 spent years researching environmental conditions before pipeline construction began. Learn more here (and find out many other things): https://t.co/oHpUKHxIRE
Already discovered during surveys for Nord Stream in 2009, a 500 year old and overwhelmingly well preserved ship wreck was researched extensively during surveys for the Nord Stream 2 Pipeline. https://t.co/6BAIdCUkX0
Meet Mikhail Karavayev, Construction Foreman at Nord Stream 2’s Russian Landfall, who brings more than 10 years of experience in concrete works for large infrastructure projects. https://t.co/OD4fnyHI93