@Jagz1975@GauravT71548031@Somnath64806208 In my view losses, while really regrettable, are part of the risk of operations. The US has suffered at least 15 manned aircraft downed against Iran. IAF hit all targets, adapted to losses and finished the war. Why not respect that.
@GauravT71548031@Somnath64806208 Sir with all due regard, open source photos provide 4 aircraft downed - locations and type too. Not much that’s kept from the foe.
@sakthivel_cit93@GauravT71548031 Is the right way to look at the situation. HAL had a contracted timetable- they committed to deliver on a schedule. As of now they are a year late. I don’t have to estimate the time taken - HAL hopefully did that before signing. Unless they are really incompetent.
@GauravT71548031@sakthivel_cit93 There is no reason for the Mk 1A to be delayed other than indifference and poor project management. All systems have been assembled from existing components.
@omarali50 The issue is the success of the tiger program - we began with a few hundred tigers 50 years ago. They number around 3500 today. Need space that’s not there else man animal conflict is inevitable. Lots of things have been done, tiger corridors etc but too many cats.