LATUR RING ROAD UPDATE
TENDER for
Consultancy Services for Preparation of DPR for 60km 4 lane ring road has been opened
2 firms have been qualified for technical
Evaluation
1.Almondz Global Infra Consultant Limited
https://t.co/anM61HbFRX INFRA SOLUTIONS
LATUR RING ROAD UPDATE
NHAI has issued tender for
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of a New 4 lane Outer Ring Road around Latur City in the State of Maharashtra
@cbdhage@AbhiPawarBJP
MSIDC has invited bids for
CONSTRUCTION OF GOVERNMENT MEDICAL COLLEGE, 430 BEDDED HOSPITAL, GIRLS and BOYS HOSTEL 100 STUDENT CAPACITY AND RESIDENTIAL QUARTERS AT DHARASHIV DIST DHARASHIV
Cost :- ₹ 285 crores
@cbdhage@OmRajenimbalkr
HADAPSAR - YEVAT NH 65
6 LANING AND ELEVATED CORRIDOR UPDATE
THE TENDER HAS BEEN OPENED
4 companies have been qualified for technical evaluation
1. Montecarlo
2. Apco infra.
3. J kumar infra.
4. Welspun Ent.
Financial bids will open soon
@cbdhage
https://t.co/TNazsDvmlO
MSIDC has invited bids for Upgradation of construction of six lane highway corridor from Ch. 8/500 to 33/500 and Upgradation of existing highway to six lanes from Ch. 8/500 to 40/00 Section At grade section of Hadapsar Yevat (NH65) in the state of Maharashtra
Cost - 3146 crores
Talegaon - Chakan-Shikarpur
4/6 laning and elevated corridor Update
The tender has been opened,
4 companies have been qualified for technical evaluation.
1. Apco infra.
2. Montecarlo
3. Ashoka buildcon
4. Welspun Ent.
@cbdhage
https://t.co/9FxEilgplS
MSIDC has invited bids for Up-gradation existing 2 lane highway to 4 lane with construction of elevated 4 lane fly over at section Talegaon to Chakan from Ch. 0/00 to 28/300 and Up gradation of 6 lane highway Chakan to Shikrapur At grade from Ch.28/300 to 53/20
Cost- 3123 crores
Update on New Latur City Ring Road .
Latur’s new 58 km Ring Road — passing through Chandeshwar, Kavha, Babhulgaon, Bhatkheda, Khulgapur, Nandgaon, Raiwadi, and Harangul — has now been officially granted the status of a State Highway! 🛣️✨
This major upgrade clears the path for wider roads, better infrastructure, and increased funding for development. Earlier, there was a demand to reroute the Ratnagiri–Nagpur National Highway through this new outer ring road, but it wasn’t approved.
However, recognizing the growing traffic and importance of the route, the Maharashtra Government has now upgraded it to State Highway status.
The 57.8 km stretch will connect:
📍 Latur–Ausa Road → Chandeshwar → Kavha → Katpur → Shirsi → Babhulgaon → Sonwati → Latur–Nanded Road → Bhatkheda → Kasarkheda → Khulgapur → Latur–Ambajogai Road → Nandgaon → Raiwadi → Harangul → Latur–Barshi Road.
With this upgrade:
✅ Wider and safer roads are on the way
✅ Funding hurdles are removed
✅ Future traffic congestion will be significantly reduced
NHAI has invited bids for Construction of 4-lane Thiruvarur Bypass (Km 15+900 - Km 30+836) in Nagapattinam - Thanjavur Section of NH-83 in Tamil Nadu on Hybrid Annuity Mode (Project Length - 14.936km) @cbdhage@TheMahaIndex @Geogeek0 @BHiren@haldilal@marinebharat@Ayush_Shah_25
MoRTH has invited bids for Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway Bhavnagar Bharuch in the state of Gujarat . @cbdhage@TheMahaIndex @Geogeek0 @BHiren@haldilal@marinebharat@Ayush_Shah_25
NHAI has invited bids for Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode
Cost - Rs 3653 Crores
NHAI has invited bids for Development of 8-Lane Elevated Flyover at Tier-1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg2 28.925 to km 42.113) section of NH60 in Maharashtra on (BOT) Mode.
NHAI has invited bids for Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg-1 12.190 to km 28.925) sec of NH60 in Maharashtra on BOT (Toll) Mode.
MSIDC has invited bids for Upgradation of construction of six lane highway corridor from Ch. 8/500 to 33/500 and Upgradation of existing highway to six lanes from Ch. 8/500 to 40/00 Section At grade section of Hadapsar Yevat (NH65) in the state of Maharashtra
Cost - 3146 crores