MOVING FUNDS IN AND OUT OF HL:
Still Confused About Depositing to Hyperliquid? This Guide Fixes That.
I have countlessly come accros persons confused and asking how do they get funds in and out of hyperliquid, both hypercore and EVM included.
Lets settle this once and for all.
Here is all you need to know and the answers to your FAQs
1. How do i make deposit from other Chains to Hypercore?
Currently Hypercore supports deposite from:
- Arbitrum (USDC, USD.e and USDT)
- Solana (SOL and Fartcoin)
- Bitcoin (BTC)
- Etherium (ETH),
To deposit to hypercore, use this link here https://t.co/mXN0LuGrib
- Connect your wallet.
- Click on “Deposit”,
- Select chain and assets.
- For Arb chain u only need to sign a trx,
- For other chains, a unique address is provided
- copy the unique address and transfer the the assets, - Return and click “done” wait for ur assets to reflect.
NB: Observe the treshold amount, for sol the least u can deposit or withdraw is 0.2sol.
The croschain infra is powered by @unitxyz
2. Can I deposit directly from exchanges?
- YES
There are some exchanges that support $HYPE deposit/withdrawal. The popular ones includes but not limited to:
https://t.co/h3KLrbwpFG,
Mexc,
Bitget,
Simpleswap
CoinEx etc.
Some of them support both Hypercore and EVM, check and select the proper chain that applies to you,
I personally recommend sending to L1, then transfer to evm
Hypercore CA: 0x0d01dc56dcaaca66ad901c959b4011ec
3. How do I transfer HL assets to and fro hypercore and EVM?
Quite easy, while the wallet is still connected
- Go to “trade” tab
- "establish connection” if you have to.
- click the “transfer to EVM’ option beside the token balance.
- Togle the arrows to select direction (spot to evm vice versa
- sign the trx to finish up.
For tokens other than $HYPE u might get the warning in the screenshot here.
The evm CA displayed is that of the token you are trying to transfer, if you are arent sure the token is deployed already on evm, search the CA on dapps such as hyperswap, if still not sure, test with small amount before going big.
4. How do I bridge from other chains to hyperEVM?
Much easier than it sounds, Several dApps support bridging directly to HyperEVM:
Use in-dApp bridges:
@HyperSwapX (has a built-in bridge tab)
@LiquidLaunchHL (also integrates bridging)
Steps:
- Navigate to the "Bridge tab"
- Select source chain & token
- Select destination as HyperEVM
- Confirm and sign the transaction
If you’re bridging from or to Solana, you will have to connect your Solana wallet as well.
Other tools that support cross-chain bridging to HL:
- Debridge
- jumper Exchange
5. Can I only bridge to $HYPE or other tokens are supported?
Yes other tokens are supported.
Debridge and Jumper allows bridging of your choice assets from other chains to varieties of hyperEVM tokens. you can paste the the CA to fect the token if it doesnt appear by default. Nice job @jumperapp @0xluude and team for this great integration.
6. which is the best wallet to use for HyperEVM?
Outrighly, I recommend rabby wallet by @Rabby_io for the best experience. it does not only give the best user experience, It has hyperevm RPC integrated, tracks your hyperevm portfolio automatically all in one place very beatiful to see.
Inasmuch as there are still couple of other ways to deposit to HL didnt mention, I beleive these are among the easiest way with less drama.
However I will add more options with time if I see the need to.
Get started already.
Follow, like, bookmark and rtw to further push the content to folks who needs it more.
Token deployers on Elysium can now pay 100 KNTQ to have their token info verified on the official Elysium explorer.
100% of KNTQ paid by token deployers are burned.
@Enter_Elysium@opensea What happened to supporting the marketplace on your own chain @0xOmnia@kalosfun brought you lots of users and your best support is to bend over for Opensea.
This is sickening
You can trade any memecoin on @kalosfun that Elysium chain has 👀
We are fast and have custom routes for better pricing
Give it a try, link in bio a @kalosfun