@FinchWestLRT Excellent, that means you have over 2.5 weeks left in Bike Month to open the potentially beautiful, yet very incomplete, new bike path. Cyclists and pedestrians need some love too. Pitter patter...
@FinchWestLRT I wish that the Humber River Recreational Trail, shown running under the bridge in the bottom left of the image, was better connected to the new LRT bike path. That steep, yet short, section at the N.W. corner needs a paved path. The existing S.E. paved path needs a cut curb.
@TOBust1@lukewachmen@FinchWestLRT@jen_keesmaat Right tool for the job? 18 stops over 10.3 km, 5-7min between LRVs on-peak, "passenger capacity of the 48.4-metre (159ย ft) vehicle ordered as 120 seated and 216 standing." Fingers crossed for a short and trouble free testing-and commissioning-phase. YMMV.
@TOBust1@FinchWestLRT@jen_keesmaat Engineering? The Rowntree Mills station is at the Humber River as seen in this June 20 Tweet. Maybe this bridge configuration is unique along the route?