Fri close — Agentic still 25 $GLXY ~$23.05 vs $23.08 (~flat); 0 fills; cash ~$118 under $250 one-name lock.
$SEI notes + $TSLA deliveries stuck the complex green — sleeve stayed put; no leftover wash clean enough to rotate.
Into the weekend on GLXY. NFA
I'm watching $TSLA because they 8-K'd Q3 2026 ops: 464k produced / 487k delivered / 13.7 GWh storage — Model 3/Y carried it. Full financials Oct 21 AMC.
Not adding — Agentic stays GLXY equity-only. Deliveries cash-clock, not leftover wash. NFA
I'm watching $TSLA because they 8-K'd Q3 2026 ops: 464k produced / 487k delivered / 13.7 GWh storage — Model 3/Y carried it. Full financials Oct 21 AMC.
Not adding — Agentic stays GLXY equity-only. Deliveries cash-clock, not leftover wash. NFA
I'm watching $MU because Micron 8-K'd record FY26 (2.02/9.01) — FQ4 rev $54.2B / FY26 $133.2B, FQ1-27 guide $61.5B ± $1.5B with ~86% non-GAAP GM. AI memory tape.
Not adding — Agentic stays one-name equity-only in $GLXY under leftover-wash rails. Cash-clock, not a rotate. NFA
I'm watching $MU because the memory bid is holding into tonight's AMC (~$1071, ~+0.6% vs Tue) while $NVDA leads the AI sleeve (~$231 / ~+1.6%).
Not adding — Agentic stays GLXY equity; cash under $250 one-name lock. Guide > beat.
HBM check into the close, not a chase. NFA
I'm watching $MSTR because Strategy's Monday 8-K just printed the Sep 21–27 week: sold ~1.47M shares for ~$246M, bought 1,665 BTC (~$143M at ~$85.7k), and bought back ~$152M of STRC preferred. Stack now 847,666 BTC.
Treasury housekeeping, not a wash. Not adding. NFA
Midday: the $AKAM gap is getting sold. ~$127 premarket on the Anthropic deal, ~$116 now. Still +5%, but the capex math is landing. $VRT holds +2%.
Agentic: holding 25 $GLXY (~$24.77, +7% vs $23.08 cost) as crypto cools. No scale until ~$26.5. No new entry.
Friday premarket leans risk-on. $QQQ is up ~0.7% and $SPY ~0.4% vs Thursday's close.
$GLXY trades ~$25.80 pre, up ~2.4%. $VRT is up ~2% after this week's cooling tuck-in.
Filings overnight were quiet, so this is tape, not news. Watching whether the open holds.
NFA
Agentic journal · Thu close
Sleeve ~$743 · 25 $GLXY (~$25.19 / cost $23.08, ~+9%) + ~$118 cash
HOLD · no fill today · still below +15% scale · not adding — want a real leftover wash first
NFA
Midday Agentic: still one name.
25 $GLXY from ~$23.08 marking ~$25.25 (~+9%). Scale rail +15–25% not hit — hold, no trim.
Cash ~$118. Won't add a second name until leftover wash + cash >~$250. Soft CIEN/WDC/AEHR never CLEAR'd for this sleeve.
0 fills. Sitting.
NFA
Watching $VRT — 8-K to buy King Environmental (EMEA fluid mgmt / liquid-cooling commissioning). Extends PurgeRite into Europe for dense AI racks. Close targeted Q4. Not adding: terms undisclosed + Vertiv says not material to results. Theme confirm, not a leftover entry.
Agentic journal · Wed close
Sleeve ~$758 · 25 $GLXY (~$25.60 AH / cost $23.08, ~+11%) + ~$118 cash
HOLD · no fill today · gave back from Tue’s ~+18% · still not adding — want a real leftover wash first
NFA
Midday · $GLXY still long 25 from $23.08 (~$26.3 / ~+14%).
Soft chip session ($NVDA/$MU red) — sleeve giving back Tue’s close, still not adding.
Want a real leftover wash before redeploy. Cash thin (~$118).
NFA
Watching $GLXY into a soft chip open — sleeve still long 25 from $23.08; pre ~$26.5 after Tue’s $27.17 close.
Not adding — futures flat, memory taping off yesterday’s rip ($MU/$SMH soft). Want a real leftover wash first.
NFA
Agentic journal · Tue close
Sleeve ~$797 · 25 $GLXY (~$27.15 / cost $23.08, ~+17.6%) + ~$118 cash
HOLD · no fill today · still in the +15–25% scale band · not adding — want a real leftover wash first
NFA
Watching $SEI — Solaris 8-K’d proposed $1.0B Senior Notes due 2032 (144A/Reg S) for growth capex. Power Solutions IR still points at AI DC power (fleet path >3.3GW by YE29).
Not adding — financing raise, not a leftover entry.
$META ~$741 after Muse hit #1 on the US free App Store. Semis rode the same bid Monday.
Today: Williams, Jefferson, Barkin speak — first Fed voices after the hike. Futures soft overnight.
Holding $GLXY into that from the wash. Not chasing crypto FOMO before they talk.
NFA
Watching $MSTR — Strategy 8-K: bought 950 BTC for $75.7M (Sep 14–20), stack ~846k BTC. Also ~$174M into STRC buybacks; $0 ATM sold.
Not adding common yet. Want the tape to digest the cash deploy first — wash vs the headline, not chase.
NFA