Griffiths noted historic Newcrest data indicates Hasties mineralisation extends over 1 kilometre of strike. Rock-chip samples grades of up to 37g/t Au and 21% Cu.
I hear on the grapevine #GGP allowed Rincon access to their microfiche library
#Telfer Hub
https://t.co/lGIQRCUWAF
$RCR is selling its Laverton assets located in the Eastern Gold Felds of Western Australia.
This will enable management to redirect its existing funding towards the Telfer South #Gold-#Copper Project situated in the Paterson Region and Crackerbox assets in the Murchison Goldfields.
#stocks $ASX
Couple with connections to #Telfer
Rincon divests Laverton - ties up with focus on Hasties Telfer South. Some think the #GGP sp will plateau on #Havieron production. I think the Hub has potential to become another Kalgoorlie
https://t.co/BfGcI4hlH7
https://t.co/MNRLprqlac
$RCR to sell its Laverton to Galleon Metals Limited.
🔹$500k in Galleon shares (on IPO)
🔹Galleon to fund all future exploration
🔹Capital redirected to Telfer South & Crackerbox
$RCR progressing potential sale/JV of West Arunta.
Read 🔗https://t.co/b8Cgi8LEhr
@DavidLenigas
Hardly a day goes by without some great news for @Greatland_GGP even indirectly.
-Good News for the #Telfer Hub and the Paterson with funding for Telfer south. Hasties is outside the JV but the processing of this ore has been agreed says Mr Lenigas.
https://t.co/znRk96mOXg
We at Rincon Resources are busy cleaning up our asset base so that we can concentrate on our two most important gold projects. Telfer and Crackerbox. A lot of great moving parts coming together now to create something that can really add value with. https://t.co/FB7TpDWK67 $RCR
$RCR featured on @RatsRant - WHATS HOT - after closed up 31% yesterday to finish at 2.1c on $340k stock traded.
The reason they were up was because they announced a placement to raise $3.1m @ 1.5c through Yelverton Capital.
#Gold#Copper#Mining#ASX#Telfer $RCR.ax #GGP $GGP
🚨 $RCR – TELFER SOUTH IS HEATING UP 🚨
This is a serious gold-copper development in the shadow of a world-class mine.
Let’s break it down properly.
🔹 Gold up to 37.1g/t Au
🔹 Copper up to 21% Cu
🔹 Newly defined high-grade zone – Hasties Central
🔹 Mineralised trend now extends >1,000m strike
🔹 Located just 10km SW of the Telfer Gold-Copper Mine
Rincon reviewed Newcrest’s 1991 historic rock-chip database and verified it using certified lab data.
What stands out:
• An extensive high-grade gold-copper zone extending ~300m along strike
• Up to 100m width
• Strong evidence of continuity between Hasties Main & Hasties SE
• 75% of standout samples coming from Hasties
Central — largely outside the current MRE
This materially expands the footprint.
And the grades are powerful:
30g/t+ gold samples
Double-digit copper samples
Multiple +5g/t Au and +5% Cu hits across the trend
Now consider this:
The updated drilling is expected to extend mineralisation ~150m further toward Hasties Central and confirm it remains open at depth.
So you’ve got:
✔️ High-grade surface samples
✔️ Expanding strike length
✔️ Near-surface mineralisation
✔️ Open system
✔️ Drill rig mobilising this quarter
✔️ Resource upgrade coming
Now zoom out.
📍 Telfer Gold Mine is 10km away.
📍 Same belt. Same structural architecture.
📍 Infrastructure in the district already proven.
$GGP (~$10B market cap) entered a Farm-In & JV over 200.8km² of this ground in December 2025.
Major companies don’t farm into small ideas.
They farm into systems with scale potential.
This is early-stage leverage to a proven gold-copper province.
The market hasn’t fully priced in:
• The >1km mineralised trend
• The high-grade copper component
• The expansion potential beyond the existing MRE
• The district-scale optionality with Greatland involved
Drilling in 2026 will be pivotal.
If continuity holds across Hasties Main – Central – SE…
If depth extensions confirm…
If the MRE grows in phases as planned…
This can re-rate fast.
Gold strong.
Copper strong.
Strategic location.
Major JV partner.
Expanding system.
$RCR is building something meaningful at Telfer South.
all for $ 4 mil EV
Watch this space closely.
DYOR
Not financial advice
🚨 $RCR 2.0c +25% 🚨
Volume expanding.
Momentum building.
Structure tightening.
This chart is starting to look very interesting.
We’ve just reclaimed 2c with strong volume and price is holding above the short-term moving averages.
Zoom out:
• Long base formed between 1.4c – 1.6c
• Higher lows since December
• Selling absorbed
• Volume spikes on green days
• Trend now turning up
The key level is 2.5c.
That’s the major supply zone from previous highs.
Once 2.5c clears cleanly and holds…
There’s very little historical resistance above.
That’s when blue sky opens.
4c – 5c becomes very achievable in a strong gold/copper tape, especially with:
✔️ >1km mineralised trend
✔️ 37g/t gold samples
✔️ 21% copper samples
✔️ Drill rig mobilising
✔️ Resource upgrade building
✔️ Greatland JV in place
This is how small caps re-rate:
Base
Absorption
Breakout
Momentum
Repricing
2.5c is the trigger.
Above that, this can move fast.
Watch volume closely.
$RCR
DYOR
Not financial advice
$RCR @RinconResources is up 31.25% today after announcing the successful completion of a $3.1 million placement, signalling strong investor backing for its next phase of exploration.
Proceeds to be used to support exploration primarily at the 100% owned Telfer South #Gold-#Copper Project.
Yelverton Capital acted as Lead Manager to the Placement, bringing in a cohort of sophisticated and professional investors.
@DavidLenigas@Sonder_Managemt
$RCR raises $3.1M from sophisticated & professional investors to accelerate exploration at its 100% owned Telfer South #Gold–Copper Project.
🔹 Larger drill program planned
🔹 Hasties MRE expansion targeted in 2026
Read 🔗https://t.co/1gSncFitvG
@DavidLenigas
$RCR.ax $GGP
Big #gold news. Something good cooking up near Telfer with >ounce gold + copper to >20% outcrop reported by Newcrest Mining and joining @RinconResources Hasties deposits to over 1km long now! Drilling to start soon. https://t.co/oTNpkM5yHt $RCR @ausstockchick
$RCR Hasties gold-copper trend now extends >1km along strike, ~10km SW of Telfer.
🔹 Historic rock chips up to 37g/t Au & 21% Cu
🔹 “Hasties Central” zone (>300m strike, up to 100m wide)
🔹 Drill rig mobilisation this quarter.
https://t.co/BxGy6F4h38
@DavidLenigas
$GGP
$RCR has received approvals for drilling at its 100% owned Hasties Main & Hasties SE #gold-#copper deposits, ~10km south of Telfer.
Rig mobilisation planned later this qtr, targeting resource growth. Revised MRE on track for end-Q1.
https://t.co/VF8BBpoELa
@DavidLenigas
$GGP
$RCR releases Dec 2025 Quarterly. Key progress at Telfer South incl. Farm-In & JV with @Greatland_GGP, strong RC drill results at Hasties, mineralisation extended ~150m along strike and remains open.
Read 🔗https://t.co/mkVTt74wey
@DavidLenigas#Gold#Copper $RCR.ax #GGP $GGP
$RCR outlines Q1 2026 plans at 100% owned Hasties gold–copper project, 10km south of Telfer.
Targeting an upgraded MRE after drilling extended mineralisation ~150m along strike.
Read https://t.co/NGyupbqlW5
@DavidLenigas#Gold#Copper