Team of certified designers & construction administrators specializing in projects needing integrated approaches to
AV, LV, security, and data management.
#Poweroverethernet is changing how power is distributed to devices that require power. Network switches providing PoE are functioning as a utility. To ensure PoE performance the industry is implementing field testers that certify data performance and PoE capability.#TipTuesday
#avtip#avquote#WednesdayWisdom “even the most high-quality AV components can offer poor returns for the customer if the equipment isn’t part of a well conceived and executed design. But with expertly designed AV, you’re in a position to create a connected, collaborative world”
#DidYouKnow the 2020 National Electric Code has updated the Ampacity table in sect. 725.144 from the initial Ampacity Table in NEC 2017. The values in NEC have been rounded up. Therefore, rounding up current values may permit larger current down some cables. #TipTuesday#cables
#DidYouKnow The telecommunications industry has adopted 4 levels of PoE. Level 1 15.4 Watts;Level 2 30 Watts;Level 3 60 Watts;Level 4 90-100 Watts
To transmit PoE it is recommended to use Category 6 or 6A cables as the larger #gaugewire will dissipate heat better. #TipTuesday
The longest known phone cable in the world is called FLAG (Fiber-Optic Link Around the Globe). It is 16,800 miles long, connecting calls from Japan to the United Kingdom. It can support over half a million calls at once. #DidYouKnow#FunFactFriday#technology
If you thought your 4K Ultra Hd Tv had a crisp, lifelike picture, imagine a resolution of 7680×4320 and 33 million pixels paired with screens boasting more than 1 billion colours, the picture suddenly becomes more alive, more immersive, and far more real. WELCOME TO #8K#AVTIP
Looking forward to moving into our new office. It needed to be updated just a bit so one of our talented employees drew up our new #Layout All our projects always start with a #drawing and #design layout. #Freshstart#FridayFeeling
Ever wonder how a good set of construction documents come to be? After countless hours of design, review, and redlining these drawings will be ready to release to #LowVoltage contractors. #FastPacedFriday#design
Here’s a looks at the final product! This #telecom room provides the data for Phase 2 of The Science Complex @providencecol Cable management and labeling are keys to a useable TR. We design cabling systems that are #colorcoded to ensure ease of identification. #finishingtouch