We finished the endurance with our RP19c,
but unfortunately we had technical issues with our RP19e and couldnβt finish Endurance with it π
#FSS19#lastday
Today at 11.00 oβclock weβll finish statics with the Engineering Design Report C.
Afterwards the dynamics will start with SkidPad at 14.00 oβclock and tonight the legendary night Acceleration will take place π
#RP19c#RP19e#awakethebeasts
Furthermore, today is the second Statics day for our team.
In the morning, we started with Cost Report C, at 13.00 oβclock Business Plan Presentation E and finish with Cost Report E at 15.30.
#RP19c#RP19e
Yeah π
We completed/finished every single point of our todayβs schedule βοΈ
Now, we prepare our cultur dinner for tonight, in german called βApfelstrudelβ.
Come over and take a piece π΄
#formulastudentfamily#cultursharingdinner#apfelstrudel
Our schedule for today:
RP19c
9.30h Pre Inspection
10.30h Mech Inspection
13.00h Business Plan Presentation
RP19e
9.50h Engineering Design Report
13.00h Pre Inspection
#FSS#RP19c#RP19e