The MumbaiтАУAhmedabad Bullet Train Project is utilizing ultra-heavy crawler cranes with lifting capacities of up to 1,700 tonnesтАФamong the largest ever deployed in Indian rail infrastructure. These cranes are essential for lifting and installing massive bridge segments and steel structures, showcasing the remarkable engineering scale behind India's first high-speed rail corridor. ЁЯЪДЁЯПЧя╕ПЁЯЗоЁЯЗ│ #rslive