🚨 BIADA has applied for EC for the proposed Nawanagar Industrial Area in Buxar, Bihar.
Location: Nawanagar Block, Buxar
Area: 404.68 acres (163.76 hectares)
BIADA has also awarded a ₹97.37 crore contract to Vishwa Samudra Engineering Pvt. Ltd. for infrastructure development works in the proposed SEZ at the industrial area.
Condition of the Foot Over Bridge at Danapur Junction.
Kindly take immediate cognizance. @drmdnr@ECRlyHJP
Passengers deserve safe and well-maintained infrastructure.
🇮🇳 India's Longest River Bridge Set to Be Inaugurated by PM @narendramodi soon.
Load testing for Phase 2 of the Kacchi Dargah–Biddupur Bridge was done two weeks ago.
J.P. Ganga Path Samgra Udyaan Project (Phase-1)
• Project Cost: ₹387.4 crore
• Construction Period: 24 months
• Executing Agency: M/s Ram Kripal Singh Construction
Read the full thread for project renders, design, and DPR details.🧵👇
🚨 J.P. Ganga Path Samagra Udhyan Project
If BSRDCL delivers this project anywhere close to the quality shown in the renders, it could be a game changer.
Agency: M/s Ram Kripal Singh Construction
Project Cost: ₹387.4 crore (Phase 1)
Total Area: 175.1 hectares
🏥 AIIMS Patna New Building Construction Update
Emergency Medicine Building Cost: ₹38.1 Crore
🚧 Construction work is progressing rapidly.
🏥 The expansion will increase patient treatment capacity.
👨⚕️ Modern facilities for doctors, medical students, and researchers.
A major boost to Bihar's healthcare infrastructure.
बेगूसराय का तेघड़ा रेलवे स्टेशन अब पूरी तरह बदलने की ओर है। अमृत भारत स्टेशन योजना के तहत स्टेशन का आधुनिकीकरण तेजी से चल रहा है और निर्माण कार्य अब लगभग अंतिम चरण में पहुंच चुका है।
जल्द ही यात्रियों को मिलेगा नया स्टेशन भवन, बेहतर प्रतीक्षालय, आधुनिक सुविधाएं और पहले से कहीं बेहतर यात्रा अनुभव। तेघड़ा स्टेशन की नई पहचान अब जल्द ही सबके सामने होगी। 🚉
🚨Bihar Govt. has officially issued a Gazette Notification approving Patna Municipal Corporation's ₹200 crore Municipal Bond.
• Development of organized vending zones
• Redevelopment of the New Market near Patna Jn.
• Other priority urban infra. projects across Patna
The 10-year bond will be listed on the NSE.
Darbhanga Airport New Terminal Update❤️
Painting and finishing work has officially begun at the new terminal building of Darbhanga Airport.
• Total Project Cost: ₹911.66 Crore
• Terminal Building Cost: ₹674.96 Crore
• Project Area: 52+ Acres
• Annual Capacity: 3 Million Passengers
• Modern terminal with aerobridges, advanced baggage handling and world-class passenger facilities.
• Target Completion: 30 November 2026 (subject to project progress)
A major aviation upgrade for Mithila and North Bihar is taking shape.