Job in Rochdale this afternoon. Council resurfaced the street in May. Today three utilities had opened the same stretch. Temporary lights both ends. Customer waiting with keys and a cold cup of tea. The rewire took an hour. Finding a place for the van took longer.
@I_D_A_U_@ECIU_UK@jessralston2 More iron in the ground is not free. On domestic jobs the customer feels it as kit, labour and a longer wait before the board is live.
@ConstructionEnq £31m on social housing only becomes real when the boards, bonding and first-fix packs are on the programme, not just the tender headline.
@7Kiwi Unplanned cut next to the control room is the sort of detail that stays in a site diary. Customers only see the blackout. They do not see how close the control kit sits to the ordinary network.
Wholesaler in Trafford. Needed three AFDD modules for a Cheadle board. Two on the shelf. Third due next week. Job was booked for Wednesday. Moved it to Monday after. The van still left with half a kit.
@ConstructionEnq When the contracting arm goes, the half-finished installs stay. Someone finishes the boards. Someone else chases who owns the warranty.
Phone call from Prestwich this morning. Customer waiting on a knee date since November. Wants the outdoor light and bathroom extract sorted before he cannot manage the steps. The list is months. The job is ninety minutes. He needs the steps lit before the list even moves.
@PippaP22 Warm rooms are not a lifestyle upgrade on a March bill. On a house I wire the heat is either on the quote or the customer sits cold. Comfort is an invoice line.
@7Kiwi@lfg_uk Credibility goes when the live frequency call and the public line disagree. On a plant floor the meter is the referee. Press briefings are not.
@I_D_A_U_@PippaP22 Ten gigawatts of flexibility is not a spreadsheet cell. On site it is customers paid to go cold or run a set. Voluntary DFS gets you a few percent. The rest is load you force off.
Job in Stretford this afternoon. Tenant out Tuesday. Landlord wanted the EICR emailed tonight. Melted spur behind the fridge and a circuit missing from the schedule. Made the live faults safe. Remedial list longer than the tenancy gap. One void week is rent he does not get back.
@ret_ward Leaving reserves in the ground does not keep the van full. On a winter job the price at the pump is the line on the quote. Signalling is policy language. Diesel is the invoice.
@richardwilson68 Ownership rows land as delivery dates. If the plant sits under a French state share the upgrade still waits on the same connection date. Customers pay for the wait either way.
@Artemisfornow Poor technique gets celebrated until the warranty call. On site a bad finish is a rework day and a customer who will not pay the second invoice. The press likes the painting. The van pays for the callback.
Parked up in Eccles. Meal deal £5.20. Customer rang about loft lights before the decorator arrives Monday. Taking it means Friday rewire slips a day. The sandwich is cheap. The diary is not.
@johnredwood Golden shares were an ownership tool with a maintenance bill attached. Who holds the utility still decides who pays for the cable when it fails. Foreign owners do not rewrite that invoice.
@54JohnBull When the grid was run as an engineering job the calls were about faults and load. When it is run as a policy office the calls are about targets. Copper still fails the same way either structure.