Supreme Court order dated 23.11.2026 in MA Diary No. 17103/2026 (Loganathan v. State of Tamil Nadu), on unauthorised construction and misuse of sanctioned use. The 13-page signed order is attached.
The order makes it clear that enforcement of building laws is the duty of local authorities. In Odisha, that means BMC, BDA, CDA, the other development authorities and urban local bodies, and the H&UD Department.
What the order means for Odisha:
1. Authorities must act now. The Court held that the pendency of this matter "would not come in the way of the Municipal Corporations and other allied authorities acting in accordance with law." Pending cases of unauthorised construction, deviation and misuse must therefore be dealt with without delay.
2. Citizens can seek remedies directly. Residents affected by unauthorised construction or misuse of residential buildings may approach the Municipal Corporation, the development authority, the Tribunal or the Orissa High Court in their individual cases.
3. The State Government must file an affidavit. The State, through a responsible officer, has to place its suggestions before the Supreme Court, with the municipal bodies coordinating with the H&UD Department. The matter is listed on 06.01.2027.
Observations of the Court:
• "A city is a shared civic space and not merely an aggregation of individual property entitlements."
• "The rule of law is rendered hollow when the authority charged with enforcing it does not enforce it."
• The state of municipal inspection is "in shambles", and inspections done after a building has come up are "a sham".
• Unauthorised construction "often flourishes with the active connivance of municipal authorities", in the hope that the State will "regularise" it.
• "Private ambition must remain within public limits."
• Regulating land use and building construction is a constitutional function of municipalities under Article 243W and the Twelfth Schedule.
#UnauthorisedConstruction #Odisha #Bhubaneswar #SupremeCourt #RuleOfLaw #UrbanPlanning #HomeBuyers
Bimalendu Pradhan • @bpradhanodisha • [email protected]
➡️ The rule of law is rendered hollow when the authority charged with enforcing it does not enforce it.
➡️ The state of municipal inspection is "in shambles", and inspections done after a building has come up are "a sham".
@bmcbbsr@ChanchalRanaIAS@BDA_BBSR#Bhubaneswar
Residents of Trident Galaxy III, Bhubaneswar, seek clarification and intervention regarding reported ₹2,500 PNG connection charges.
We request @GAILIndia@PetroleumMin@PNGRB to clarify the applicable rates and ensure transparent billing for consumers.
#PNG#GAIL#Bhubaneswar
⚠️ @bmcbbsr itself placed 7,756 violations on record before the Supreme Court. So it knew. Knowing, and still not acting, is not negligence; in the Court's words, it is "active connivance".
SUPREME COURT, 23 NOV 2026: MUNICIPAL AUTHORITIES IN THE DOCK
L O G A N A T H A N vs. State of Tamil Nadu & Ors., M.A. Diary No. 17103/2026
Bench: Justice B.V. Nagarathna and Justice Sanjeev Sachdeva
KEY FACTS
• The case continues. Next hearing: 6 January 2027, 2 pm.
• The Court keeps the larger issue of unauthorised construction before itself.
• Individual property disputes go to the authority, tribunal or High Court concerned.
WHAT THE COURT ORDERED
1⃣ No more excuses. When counsel told the Bench that a Municipal Commissioner was refusing to act, even after sealing orders, because the matter was pending in the Supreme Court, the Bench dictated: "The pendency of this matter before this Court would not come in the way of Municipal Corporations and other allied authorities acting in accordance with law."
2⃣ States must answer on oath. Every State Government and UT is to file its suggestions by affidavit of a "concerned and responsible officer".
3⃣ Citizens keep their remedy. All pending applications seeking individual relief were disposed of, with liberty to approach the concerned authorities, municipal corporations, tribunals or the High Court of the State.
4⃣ Earlier actions can be tested. Any action taken under orders passed in this application may be challenged before the appropriate authority or court.
WHAT THE COURT RECORDED
• "A city is a shared civic space, not merely an aggregation of individual property entitlements."
• Violation of building bye-laws causes "immense damage to the city's civic infrastructure, including its roads, drainage and traffic capacity."
• "We are disturbed to note their flagrant violation throughout the country."
• "Private ambition must remain within public limits."
• "The rule of law is rendered hollow if the authority charged with enforcing it does not enforce it."
• Municipal inspection is "in shambles". It "is often undertaken after the building has risen and the violation has become a fait accompli." Such inspections are "a sham".
• "It is also an open secret that unauthorised construction often flourishes with the active connivance of municipal authorities", in the hope of regularisation "particularly before an impending election."
The order extracts Articles 51A(a) and (j), and Article 243W read with the Twelfth Schedule, which places urban planning, regulation of land use and construction of buildings squarely within municipal responsibility.
FROM THE BENCH (oral)
On the "price" of violation:
"What is the price paid for sanctioning of a plan? What is the price paid every time there is a breach at every stage of the building? What is the price paid by the person to see that the demolition does not take place?"
On municipal corporations:
"It is hand in glove with those citizens. We are not mincing words. We know what it is happening."
On equality before the law:
"Why should some persons, some citizens violate and get away with it, while the others follow the law?... Why should not everybody be under the compulsion of the law?"
On the States:
The Bench wants States to come and say, "you please strengthen our hands... in order to ensure that we perform our duty without being tempted by any citizen." They must say, "We will comply, we will do it." The Bench added: "We have something else in our mind. Today we are not disclosing anything."
On inspectors:
"What is the inspector doing?... If the officers are strict in inspection, and at that stage they curb all this, then people will be really scared."
On residential areas:
"One is a house, next is a hotel, third is a software company, fourth is a house. Our residential areas are gone!"
WHAT TODAY'S ORDER DOES NOT MEAN
• It is not a stay on sealing or demolition. The Court said the opposite: pendency cannot stop authorities acting in accordance with law.
• It does not dilute the law. Barjatya (2024) and Kaniz Ahmed (2025) remain binding on every authority under Article 141.
• It is not a licence for violators. The Bench's sharpest words were for those who build beyond sanction and wait for regularisation.
FOR ODISHA
BMC itself placed 7,756 violations on record before the Supreme Court. So it knew. Knowing, and still not acting, is not negligence; in the Court's words, it is "active connivance".
The pendency of this case is no longer an excuse, and Barjatya (2024) still binds every authority.
The question for BMC is now point blank: what action, against whom, and by when?
The Bench also observed that residential areas are being converted "by development authorities, not by the municipal corporations".
The Supreme Court has said what everyone already knew. The question now is whether Odisha will say, in the Court's words, "We will comply, we will do it", and mean it.
#UnauthorisedConstruction #SupremeCourt #Bhubaneswar #Odisha #RuleOfLaw #Barjatya
@SecyChief@HUDDeptOdisha@bmcbbsr@ChanchalRanaIAS@ushapadhee1996@_anugarg
"BANK APPROVED" OR "LOAN AVAILABLE"? THERE IS A BIG DIFFERENCE.
The bank approved the project for lending to YOU, not for protecting YOU.
Many builders proudly advertise "SBI APPROVED" or "BANK APPROVED PROJECT", with the bank's logo next to it. Buyers read this as a safety certificate from India's biggest banks. It is not.
❓ Does the bank guarantee DELIVERY of your flat? No.
❓ Does the bank guarantee QUALITY of construction? No.
❓ Does the bank guarantee clear TITLE? No.
❓ Does the bank check whether the NOCs and approvals are genuine with the issuing authority? There is no public mechanism for it.
❓ Does the bank act when the builder deviates from the plan or delays? No.
So what DOES the bank approve?
Only one thing: that it is willing to lend in that project. In banking, this is called APF, "Approved Project Finance." The check is done to protect the BANK'S LOAN. It is not a legal approval of the land, the plan or the building.
The bank's real security is not the flat. It is YOU: your salary, your EMIs and your personal liability. Whatever happens to the project, the EMIs never stop.
What the builder writes ➡️ What buyers think ➡️ What it actually means
1⃣ "SBI Approved" ➡️ SBI has verified the project is legally safe ➡️ SBI is willing to lend here
2⃣ "Bank Approved Project" ➡️ The bank has guaranteed my title ➡️ The bank accepts the flat as security for its loan
3⃣ Bank logo on hoarding ➡️ The bank stands behind this builder ➡️ A business tie-up between the builder and the bank
Ask yourself one question:
If the building is found illegal tomorrow and demolished, who loses?
🏚️ You lose your home.
💸 You keep paying EMIs for a flat that no longer exists.
🏦 The bank loses nothing. Your loan agreement still binds you.
That is the real meaning of "Bank Approved."
The double standard:
In their marketing, banks tell buyers that an approved project means they can be assured it is legally clear. One major private bank's own website says approved projects are examined "so that interested home buyers can be assured that the project is legally clear."
But in court, the bank's position is the opposite: the scrutiny was only for its own protection. The Karnataka High Court has accepted that position (CRL.P No. 8395 of 2025, Paras 21 & 22).
Banks cannot have it both ways.
And when banks and builders work together, buyers pay the price:
In Himanshu Singh v. Union of India (SLP(C) No. 7649/2023), the Supreme Court found an "unholy nexus" between banks and builders in subvention schemes. Banks paid loans directly to builders. Builders defaulted, flats were not delivered, and banks chased homebuyers for EMIs. The Court observed that "not a single bank is free from doubt" and ordered a CBI probe. CBI has registered 50 FIRs and filed charge sheets in 17 cases so far.
So why do banks allow builders to use their name and logo with the word "APPROVED"? A bank's brand value is being used to win buyers' trust, while the bank accepts no responsibility to those same buyers.
Under the law, only three authorities "approve" a project:
✔️ Development Authority: building plan
✔️ RERA: project registration
✔️ Municipal / Development Authority: Occupancy Certificate
A bank is not one of them.
My asks:
1️⃣ @RBI@DFS_India: Direct all banks and HFCs that builders must not use "Approved by [Bank]". Only "Home loans available from [Bank]", with a clear line that it is not a guarantee of title, quality or delivery.
2️⃣ @TheOfficialSBI and all lenders: Publish the terms on which builders may use your name and logo, and act against those using it without a tie-up.
3️⃣ Every lender: Give the borrower a copy of the legal and technical report the borrower pays for.
4️⃣ @OdishaRera and all State RERAs: Treat "Bank Approved" claims without a clear disclaimer as misleading advertisement.
5️⃣ @ascionline: Examine "Bank Approved" claims in real estate advertising.
@OfficialSBICare has asked me to share my concern by DM. I have sent it with photographs of such advertisements, and I will share the response publicly.
Remember:
"Approved" should come only from those who approve under law. A bank's name on a hoarding is a loan offer, for their own business, not a legal guarantee.
#HomeBuyers #BankApproved #APF #RERA #HomeLoan #TitleCheck #ConsumerRights #Odisha #Bhubaneswar
@RBI@FinMinIndia@nsitharaman@DFS_India@TheOfficialSBI@OfficialSBICare@HDFC_Bank@ICICIBank@AxisBank@bankofbaroda@pnbindia@UnionBankTweets@canarabank@OdishaRera@HUDDeptOdisha@CMO_Odisha@MoHUA_India@ascionline@jagograhakjago@CBIHeadquarters
Found this relevant Insta post:
https://t.co/ssWZaittOZ
Bimalendu Pradhan • @bpradhanodisha • [email protected]
HOME LOAN SANCTIONED? THAT DOES NOT MEAN YOUR PROPERTY TITLE IS CLEAR.
The bank checked your papers, its legal department cleared them and your loan was sanctioned. Many buyers take that as proof the property is safe. The Karnataka High Court has now said clearly that it is not.
HDFC Bank v. State of Karnataka, CRL.P No. 8395 of 2025, High Court of Karnataka, Bengaluru
Para 21: "The fact that the legal department of the Bank examined the documents and thereafter sanctioned the loan does not, by itself, amount to a certification of title in favour of the purchaser."
Para 22: "The opinion or scrutiny undertaken by the Bank cannot substitute the independent legal due diligence which a purchaser is expected to undertake to protect his or her own interest."
In plain words: the bank checks the property to protect ITS money, not YOURS. If the title turns out to be defective, the bank still has your EMIs and your personal liability. You are left with the problem.
Now the bigger question for @RBI :
Builders put up hoardings saying "Project Approved by xxxx Bank." Since when do banks approve projects?
Under the law, a project gets its building plan approval from the Development Authority, its registration from RERA and its Occupancy Certificate on completion. A bank approves none of these. What a bank does is "empanel" or "tie up with" a project so it can lend to buyers there. That is a business arrangement for its own lending, not a certificate that the land, the plan or the building is legal.
Yet the word "APPROVED" next to a bank's logo makes ordinary buyers believe the project has been vetted and is safe. When something goes wrong, the bank says it only checked for its own purposes, and the court agrees.
@RBI should direct all banks and HFCs to:
1. Stop allowing the words "Approved by" next to their name in builder advertising. Use "Loan available from" instead.
2. Give every borrower a written note that the bank's legal scrutiny is for the bank's security only and is not a title guarantee.
3. Share the bank's legal and technical report with the borrower, who pays for it.
Before you buy:
✅ Hire your own lawyer for an independent title search
✅ Get the Encumbrance Certificate for at least 30 years
✅ Check the RERA registration and the approved plan yourself
✅ Confirm the seller's earlier loans are fully closed, with original documents released
✅ Never buy a flat without an Occupancy Certificate
A bank's approval is not your protection. Your own due diligence is.
#HomeBuyers #RealEstate #RERA #TitleCheck #HomeLoan #ConsumerRights
@OdishaRera@TheOfficialSBI@HDFC_Bank@AxisBank@ICICIBank
FIRE in a HIGH RISE: is #Odisha prepared to answer❓
What is the status in #Bhubaneswar and #Cuttack? ❓
Since the Odisha Development Authorities (Planning & Building Standards) Rules, 2020 raised the maximum FAR to 7, towers of 20, 30 and now 40+ floors are going up across both cities. The skyline has changed. Has our fire-fighting capacity changed with it?
In the attached NOIDA video, fire tenders could not get water even to the 12th floor while it was burning. So here is a simple question: if a fire breaks out on the 45th floor of a tower in Bhubaneswar or Cuttack tomorrow, who reaches the flames, and how?
@DGFS_HGs_CD, please ask the concerned authorities like @BDA_BBSR@bmcbbsr@CDA_CUTTACK@KMCKataka@HUDDeptOdisha:
1️⃣ How many buildings of 15+ storeys have been approved since 2020, and how many are occupied today?
2️⃣ How many of these got a Fire NOC before the plan was sanctioned, and a final Fire NOC before occupation?
3️⃣ When was each one last inspected? Are the wet risers, sprinklers, pumps, refuge floors and fire lifts actually working, or do they exist only on paper?
And please ask your own department:
4️⃣ How many hydraulic platforms and aerial ladders do Bhubaneswar and Cuttack have, and up to what height can they reach?
5️⃣ Is there enough trained manpower, water supply and access road width to fight a fire above the 15th floor?
6️⃣ Has a full-scale high-rise fire and evacuation drill ever been held in either city?
Approving a tower is a matter of minutes and money. Rescuing families from its 45th floor is a matter of preparedness. Please make the data public before a tragedy forces it out.
@CMO_Odisha@MohanMOdisha@AprajitaSarangi@bmahtab@MoHUA_India@ndmaindia
#FireSafety #HighRise #Odisha #PublicSafety #HomeBuyers
Citizens familiar with the ground realities plaguing the real estate market in #Bhubaneswar shouldn’t shy away from citing them up front
⚠️ Corruption & nexus rule the roost
Homebuyers must gather all info before booking any unit
Better safe than sorry 👀 @OdishaRera
Citizens familiar with the ground realities plaguing the real estate market in #Bhubaneswar shouldn’t shy away from citing them up front
⚠️ Corruption & nexus rule the roost
Homebuyers must gather all info before booking any unit
Better safe than sorry 👀 @OdishaRera
Some issues on Real Estate sector of Bhubaneswar
(i) Demand for housing should not be confused with demand for expensive housing.
(ii) A serious structural concern is that the market appears to be producing an increasing volume of housing that many ordinary households cannot afford, while the supply of moderately priced apartments remains limited.
(iii) Public housing agencies must ensure affordable housing for ordinary working families rather than competing with private developers in premium residential sector.
(iv) A 3 BHK apartment costing ₹1.30 crore and fetching an annual rental income of ₹3 lakh represents a gross return of barely 2.31 per cent. After maintenance, property taxes, repairs and vacancy periods, the net return would be lower still. Such acquisition makes little business sense.
(v) Figures published by Prop Equity in February 2026 reveal that housing sales in Bhubaneswar declined from 6,538 units in 2024 to 4,885 in 2025, a fall of approximately 25 per cent
(vi) The Odisha Real Estate Regulatory Authority (ORERA) has an important responsibility in protecting homebuyers. It should provide accessible information on sanctioned units, bookings, unsold inventory, construction progress and expected completion dates. A comprehensive, searchable, project-wise public database covering completed unsold apartments, inventory in ongoing projects, stalled developments and construction progress would be invaluable. Actual registered transaction values, wherever available, would further help prospective buyers understand prevailing market conditions. Such transparency would benefit not only buyers but also responsible developers, financial institutions and government agencies.
(vii ) Important issue is whether every Odisha family seeking a comfortable modern home must necessarily gravitate towards Bhubaneswar.
(viii) Odisha has considerable scope to develop a network of well-planned smaller towns and urban centres. Such locations could offer affordable apartments and independent houses supported by parks, healthcare facilities, educational institutions, shopping areas and reliable digital connectivity.
******
Basic info on flat booking in #Bhubaneswar
Those seeking info on how to do due diligence may DM us.
We don’t want you to lose your hard earned money
@OdishaRera@bmcbbsr@bpradhanodisha#Odisha
https://t.co/N72F3Zx9Fp
Basic info on flat booking in #Bhubaneswar
Those seeking info on how to do due diligence may DM us.
We don’t want you to lose your hard earned money
@OdishaRera@bmcbbsr@bpradhanodisha#Odisha
https://t.co/N72F3Zx9Fp
ANOTHER CLEVER STUNT by BUILDERS, who explain away stale data with a CONVENIENT READING of the law.
WHY does the project page on the ORERA portal not reflect the correct information on "Booked units"?
WHY has @OdishaRera not mandated what Maharashtra RERA already has?
Let's understand the facts.
1️⃣ Who holds the password to the project page on the ORERA portal❓
Ans:- The builder. Under Section 5(1)(a) of the RERA Act, the Authority issues the Login ID and password to the promoter along with the registration.
2️⃣ Who updates the data❓
Ans:- The builder. Section 11(1) requires the promoter to create "his web page" on the Authority's website and enter the project details for public viewing. ORERA hosts the page; the promoter writes it.
So when a builder says "the portal is not updated", he is describing his own default.
3️⃣ The QPR is a report, not a waiting period
Ask any builder a simple question. Do you wait for the quarter to end before you buy cement, pay your contractor, or bank a booking cheque? No. You act the same day, and your books record it the same day. The quarterly return only consolidates what has already happened.
The QPR works the same way. Section 11(1) read with Rule 16 of the Odisha RERA Rules, 2017 requires it once a quarter, within 15 days of the quarter ending. It is the cumulative statement of that quarter's bookings. It was never meant to be the first time the public learns of them.
4️⃣ The booking status page is different
It is a live, unit-wise display meant for the buyer. The correct practice is plain: update each booking as it happens, and file the consolidated position in the QPR.
Nothing in the Act or the Rules stops a builder from marking a unit "booked" the day he accepts the booking amount. He issues the receipt that day. He updates his own sales chart that day. The login is in his hands. The only record he leaves untouched is the one the buyer can see.
5️⃣ Maharashtra has already closed this gap
MahaRERA Circular No. 29 of 2021 requires sold and booked units to be uploaded as soon as the booking is made, not at the end of the quarter.
❓ The question for Odisha's builders:
Why does your sales office know today what the buyer can see only after three months? Who gains from that gap?
6️⃣ What should a buyer do❓
1. Check the date of the last update on the project page.
2. Ask the builder to confirm "not available" in writing, with the unit number.
3. If the portal and the builder contradict each other, treat it as a red flag and ask ORERA to act.
7️⃣ What should ORERA do❓
1. Issue the same direction as Maharashtra. Section 37 gives it the power.
2. Link the portal with sub-registrar data, so every registered "agreement for sale" shows against its unit. Section 13(1) already bars a builder from taking more than 10% without a registered agreement. @rdmodisha@IgrOdisha
3. Link the portal with the project's designated bank account under Section 4(2)(l)(D), so receipts from allottees can be matched against the units shown as booked.
@arvindpadhee@ushapadhee1996@sureshkpujari@dr_kcmahapatra@IgrOdisha@HUDDeptOdisha@OdishaRera
🏡 16th November 2026
The Way Things stand at Trident Galaxy III #Bhubaneswar
Part OC issued by @bmcbbsr for 11 blocks
OC not yet issued for amenities. So Club house cannot be used
Builder says they’re working on it
No timeline promised ¯\_(ツ)_/¯
🏡 16th November 2026
The Way Things stand at Trident Galaxy III #Bhubaneswar
Part OC issued by @bmcbbsr for 11 blocks
OC not yet issued for amenities. So Club house cannot be used
Builder says they’re working on it
No timeline promised ¯\_(ツ)_/¯
“The next time someone shows you a "top 11 market" report, show them the ORERA home page
Before you book, check how much of that project is sold. Do not hurry. Negotiate
⚠️ IMPORTANT: Check the ORERA web page to see if the unit you are booking is still available for booking…”
ODISHA NEEDS A LIFT ACT. NOW.
A request to the Government of Odisha, Energy Department and Housing & Urban Development Department.
Odisha is building taller every year. FAR up to 7 is permitted. Thousands of families in Bhubaneswar, Cuttack, Sambalpur, Berhampur and Rourkela now depend on a lift every single day.
Yet I have not been able to find any dedicated Lifts and Escalators Act or Rules in Odisha. If such a law exists, I request the Energy Department to place it in the public domain.
What we have today:
1. Building rules and the National Building Code say a lift must be provided and how it must be designed.
2. The Electrical Inspectorate inspects a lift as an electrical installation. A 2001 State fee order lists "Lift" with a periodical inspection fee of Rs 250.
What appears to be missing:
1. A licence to erect and a licence to operate a lift
2. Registration of lift installers and maintenance agencies
3. Mandatory annual maintenance contract and log book
4. A legal duty to report every lift accident
5. Compulsory insurance and compensation for users
6. Clear penalties
The cost of this gap is real.
April 2025: a 55 year old woman died in a lift collapse at Bhadrak District Headquarters Hospital. NHRC sought a report.
March 2026: a lift caught fire at an apartment in Shree Vihar, Bhubaneswar. Two people were trapped in smoke and rescued by the Fire Service.
Other States have acted. Uttar Pradesh passed its Lift and Escalator law in 2024. Andhra Pradesh followed in 2025. West Bengal has a 2019 Act with 2020 Rules. Tamil Nadu, Gujarat, Karnataka and Haryana have their own laws. Maharashtra in 2017 to take lift licensing to regional offices and inspections to district level.
MY REQUEST: enact an Odisha Lifts, Escalators and Moving Walks Act, with Rules, providing for:
1. Registration and licence before a lift is erected or used
2. Only registered agencies to install and maintain lifts
3. Mandatory AMC, log book and periodic inspection, with time limits
4. District level inspectors and regional licensing, so no file waits in Bhubaneswar
5. Automatic rescue device, alarm and power backup in every passenger lift, as per BIS standard IS 17900
6. Accident reporting within 24 hours and a time bound inquiry
7. Compulsory third party insurance
8. A public online register of every licensed lift, with the licence displayed inside the lift car
9. Clear responsibility: promoter until handover, association of allottees thereafter
10. A time bound compliance window for all existing lifts
A lift is not a luxury in a high rise. It is the only road home for the elderly, the sick, children and persons with disabilities.
Odisha should not wait for the next accident to write this law.
@CMO_Odisha@MohanMOdisha@KVSinghDeo1@ushapadhee1996@BDA_BBSR@HUDDeptOdisha
Bimalendu Pradhan • @bpradhanodisha • [email protected]
“The next time someone shows you a "top 11 market" report, show them the ORERA home page
Before you book, check how much of that project is sold. Do not hurry. Negotiate
⚠️ IMPORTANT: Check the ORERA web page to see if the unit you are booking is still available for booking…”
WELCOME TO THE "GROWTH STORY" OF ODISHA REAL ESTATE.
PRICES UP: is that the "GROWTH" the industry is talking about❓
SALES DOWN 25%: the industry is silent about it❓
The headline builders love to quote:
Bhubaneswar named among India's "next 11 real estate markets", where home prices are up 63% since 2021 (CII-Knight Frank, September 2026).
The numbers builders do not quote:
What they themselves declared to ORERA, shown on the home page of https://t.co/VnIDJUT4Wy as on 16 November 2026: Only 29.4% of residential units sold. And only 5.4% of commercial units sold. 7 OUT OF 10 HOMES UNSOLD.
🚨making #ODISHA REAL ESTATE having ONE OF THE LARGEST UNSOLD INVENTORIES IN THE COUNTRY💯
PropEquity adds: housing sales in Bhubaneswar fell 25% in 2025, one of the steepest falls among 15 tier-2 cities.
Even the builders know it. New launches in Bhubaneswar fell 88% in July-September 2025 (PropEquity).
So what exactly is growing❓
Not sales⏸️Not buyers⏸️ Only the price💯
WANT PROOF THAT PRICE IS THE PROBLEM? ASK @BDA_BBSR
Ekamra Residency: 496 flats on offer, only 140 applications after the end of first advertised due date, and the deadline extended.
LIG/EWS (Trident Awas, Patia): 90 affordable flats starting at Rs 14.68 lakh, over 4,500 applications.
Same city. Same BDA allotment. One project cannot find a buyer for every flat. The other has 50 buyers for every flat.
The buyers have not disappeared. They have been priced out.
NOW THE REAL DANGER
In these hundred of projects (with 70% unsold inventory), 19,104 families have already booked. They have paid their savings and are paying EMIs.
A housing project is built largely with the money of its buyers. When most of the homes have no buyer, most of that money is not coming in.
So who is funding the completion of those 19,104 homes? What happens to their possession dates? Who pays their rent and EMI together while they wait?
🚨Unsold stock is not only the builder's problem. It is the biggest risk to the buyer who has already paid.
To the builders: by your own declaration, 45,948 homes are waiting for a buyer. For whom are you raising the price? Cut the price, sell the stock and finish the homes you have already taken money for.
To the home buyers: the next time someone shows you a "top 11 market" report, show them the ORERA home page. Before you book, check how much of that project is sold. Do not hurry. Negotiate.
IMPORTANT: Check the ORERA web page to see if the unit you are booking is still available for booking or not and after booking (along with the parking number), has it been marked "booked" or not.
ORERA screenshots attached. #Odisha #Bhubaneswar #RERA #ORERA #HomeBuyers
@OdishaRera@ushapadhee1996
WELCOME TO THE "GROWTH STORY" OF ODISHA REAL ESTATE.
PRICES UP: is that the "GROWTH" the industry is talking about❓
SALES DOWN 25%: the industry is silent about it❓
The headline builders love to quote:
Bhubaneswar named among India's "next 11 real estate markets", where home prices are up 63% since 2021 (CII-Knight Frank, September 2026).
The numbers builders do not quote:
What they themselves declared to ORERA, shown on the home page of https://t.co/VnIDJUT4Wy as on 16 November 2026: Only 29.4% of residential units sold. And only 5.4% of commercial units sold. 7 OUT OF 10 HOMES UNSOLD.
🚨making #ODISHA REAL ESTATE having ONE OF THE LARGEST UNSOLD INVENTORIES IN THE COUNTRY💯
PropEquity adds: housing sales in Bhubaneswar fell 25% in 2025, one of the steepest falls among 15 tier-2 cities.
Even the builders know it. New launches in Bhubaneswar fell 88% in July-September 2025 (PropEquity).
So what exactly is growing❓
Not sales⏸️Not buyers⏸️ Only the price💯
WANT PROOF THAT PRICE IS THE PROBLEM? ASK @BDA_BBSR
Ekamra Residency: 496 flats on offer, only 140 applications after the end of first advertised due date, and the deadline extended.
LIG/EWS (Trident Awas, Patia): 90 affordable flats starting at Rs 14.68 lakh, over 4,500 applications.
Same city. Same BDA allotment. One project cannot find a buyer for every flat. The other has 50 buyers for every flat.
The buyers have not disappeared. They have been priced out.
NOW THE REAL DANGER
In these hundred of projects (with 70% unsold inventory), 19,104 families have already booked. They have paid their savings and are paying EMIs.
A housing project is built largely with the money of its buyers. When most of the homes have no buyer, most of that money is not coming in.
So who is funding the completion of those 19,104 homes? What happens to their possession dates? Who pays their rent and EMI together while they wait?
🚨Unsold stock is not only the builder's problem. It is the biggest risk to the buyer who has already paid.
To the builders: by your own declaration, 45,948 homes are waiting for a buyer. For whom are you raising the price? Cut the price, sell the stock and finish the homes you have already taken money for.
To the home buyers: the next time someone shows you a "top 11 market" report, show them the ORERA home page. Before you book, check how much of that project is sold. Do not hurry. Negotiate.
IMPORTANT: Check the ORERA web page to see if the unit you are booking is still available for booking or not and after booking (along with the parking number), has it been marked "booked" or not.
ORERA screenshots attached. #Odisha #Bhubaneswar #RERA #ORERA #HomeBuyers
@OdishaRera@ushapadhee1996