Four floors of self-aware administrative muscle | Beating 💜 💛 of #UAlbany | Geriatric GenXer | #notUNH | #PurpleFam for life (or until my lease expires)
Demolition party on my roof.
$50 cover per couple includes two drink tickets and taco bar. REM cover band.
Silent auction for future development rights.
BYODM (Bring Your Own Dusk Mask)
https://t.co/bcNNQYZ6YO
@RLazear It is the front lot between MSC and the Sunoco, aka the Department of Computer Science pickle ball court.
As for the haunted mansion nextdoor, MSC and I are working on an intervention. Gotta let him hit rock bottom first.
That will be next week’s meteor strike.
In preparation for the abandonment of the front MSC parking lot, all signage is being removed beginning today.
For the duration of our access to the lot, #UABfam are free to park wherever, and however, you like.
Gondola service from Dutch Gold will begin no later than 2/1.
As 1211 Western Ave. is now tall enough to block all my morning sunlight, it is time to activate sub-directive 54B.
Please secure all copiers and large furniture that could dislodge during flight.
All personnel not returned from Uncommon Grounds by 0900
will be left behind.
It has been reported that yellow jackets are nesting in the elevator on the left.
@CNSE has summoned Ant Man to dispatch them.
In the interim, please be patient with each other and use the stairs as much as possible.
Construction started in early 2021 on the six-story complex along Western Avenue in Albany. Then it abruptly stopped this past March. https://t.co/lWq58AYvn4
I may not have a “fountain” like certain other parts of the campus, but when the torrential rain cascades off the haunted construction site next
door just so, it evokes Falling Water.