3d visual of our construction project in Acton. Slotted a new steel structure into an existing building and added 3 storeys and a basement. Very complicated project. Few months away from completion.
Photo by Vivant Homes Ltd
#difficultsite#steelwork #… https://t.co/3HtjGdGS4N
3d visual of our construction project in Acton. Slotted a new steel structure into an existing building and added 3 storeys and a basement. Very complicated project. Few months away from completion.
Photo by Vivant Homes Ltd
#difficultsite#steelwork #… https://t.co/3HtjGdGS4N
Throwback to 2014 when @vppr_architects won the RIBA London Award 2014 for the Otts Yard project. Always great building with the VPPr team and they have gone on to do some great work in the architecture field here in the UK and abroad!! #2014 #greatest #… https://t.co/So850kXwNi
Throwback to 2014 when @vppr_architects won the RIBA London Award 2014 for the Otts Yard project. Always great building with the VPPr team and they have gone on to do some great work in the architecture field here in the UK and abroad!! #2014 #greatest #… https://t.co/So850kXwNi
Halfway through our detailed refurbishment project in Tuffnel Park. Bespoke concrete beams from Holland, tight access and some very tricky detailing. All in a day’s work for the Varbud Ltd team. Architects and CGI by – @architectureforlondon
#construct… https://t.co/L8yIU37xmC
Halfway through our detailed refurbishment project in Tuffnel Park. Bespoke concrete beams from Holland, tight access and some very tricky detailing. All in a day’s work for the Varbud Ltd team. Architects and CGI by – @architectureforlondon
#construct… https://t.co/L8yIU37xmC
In a close 2nd place in Greatest Hits of 2017 was the Kew Bridge Road site.
The works involved retaining the front and flank walls, demolishing the rear buildings and creating a new RC structure behind. This was due to the façade being listed with the p… https://t.co/7i8sopi8PB
In a close 2nd place in Greatest Hits of 2017 was the Kew Bridge Road site.
The works involved retaining the front and flank walls, demolishing the rear buildings and creating a new RC structure behind. This was due to the façade being listed with the p… https://t.co/7i8sopi8PB