🏆 𝐕𝐈𝐉𝐀𝐘𝐀𝐖𝐀𝐃𝐀 𝐒𝐇𝐈𝐍𝐄𝐒 𝐎𝐍 𝐓𝐇𝐄 𝐍𝐀𝐓𝐈𝐎𝐍𝐀𝐋 𝐒𝐓𝐀𝐆𝐄!
A proud moment for the people of Vijayawada! ❤️
Vijayawada has secured 3rd Rank in the National Clean City Category at the Swachh Survekshan 2025–26 Awards 🇮🇳.
#Vijayawada#SwachhSurvekshanAwards
🚆 VIJAYAWADA – PRESENT PAN-INDIA RAIL CONNECTIVITY STATUS
I have analysed the present direct railway connectivity from Vijayawada Junction (BZA) to urban centres across all States and Union Territories except AP & TG having population above 1 lakh
@drmvijayawada#Vijayawada
🚆 VIJAYAWADA AS A PAN-INDIA TRANSIT HUB BY 2047:
My vision is to connect every Indian city with a population above 1L to BZA through a direct or seamless rail connectivity, developing BZA into a National Rail Transit Interchange connecting all corners of India
@drmvijayawada
@drmvijayawada Pls consider the construction of New Platforms at Vijayawada from 10 to 16 instead of 12 as a part of proposed modifications in BZA Yard & Expand all the Platforms to 620m length to hold a capacity of 24 LHB Coaches
(1)
@drmvijayawada Coaching Terminal-3:
Vijayawada Central near ELS BZA (Greenfield)
• Platforms - 7 (Each 620m)
• Pitlines - 6 (Already it has 2 Pitlines, 1WL)
• Washing Lines - 2
• Stabling Lines - 8 (permanently shift the Wagon Depot to near Guntupalle Workshop to utilise the land)
🚆 VIJAYAWADA AS A PAN-INDIA TRANSIT HUB BY 2047:
My vision is to connect every Indian city with a population above 1L to BZA through a direct or seamless rail connectivity, developing BZA into a National Rail Transit Interchange connecting all corners of India
@drmvijayawada
@rlda_india
Redevelopment of #Vijayawada Railway Station costs (₹742 Cr) more than MAS (₹500 Cr), CBE (₹400 Cr), BPL (₹400 Cr) & is nearly on par with SBC (₹850 Cr)
Yet, despite this massive outlay, the current DPR falls drastically short of long-term transit vision:
(1)
@rlda_india 3. Poor Station Building Design:
The proposal looks like a generic commercial complex rather than an iconic, climatically responsive transit hub. The budget prioritizes developer retail space over commuter circulation and seamless platform accessibility.
(4)
Out of 1450 buses, 150 buses are assigned as Ultra Deluxe (UD) services
• 22 Buses allot to Machilipatnam (btw MTM to VJA)
• 12 Buses to Jangareddy Gudem (JRG to VJA)
• 12 Buses to Eluru (ELR to VJA)
• 11 Buses to Bhimavaram (BVRM to VJA)
• 15 buses to Kanigiri (KNG to VJA)
APSRTC has issued an RFP for the procurement of 1,450 AC e-buses on a contract basis
Out of 1450, 45 ebuses are to Gannavaram Depot, 55 ebuses to Vuyyuru Depot
Proposed Charging Points - at VJA PNBS (8), VJA City Bus Port (2), Gannavaram (8), Vuyyuru(11)
#VijayawadaInfra
Out of 55 buses to Vuyyuru Depot:
• 20 AC ebuses for Super Luxury services likely between Vijayawada to Srisailam, Vijayawada to Vizag
• 30 AC ebuses for City Bus services in Vijayawada Region limits
• 5 AC ebuses for Ultra Pallevelugu services in Krishna-NTR rural villages
SCoR invites tenders for carring out Final Location Survey of the following Projects:
• 5th & 6th lines between Motumari - Vijayawada - Gudur (BZA Div)
• New Railway Line between Gudur to Durgarajapatnam (BZA Div)
• New Bypass at Gudur (BZA Div)
(1/2)