@NirmansLaw@_MarkSutcliffe@KatieGriffinCTV Grade separation is an unnecessary response to the August collision. Both sets of signals were functional, there's more space than usual between stop bar and tracks (angle), trains are slower there, and motorist is ultimately responsible for checking before crossing.
@metalhawk666p@JureUrsic Loss from the provincial grid usually results in all of Nepean losing power. This outage was more localised, so more likely to be tree/animal contact, vehicle colliding with post, transformer fault, etc. Should have more information from Hydro on Monday.
@PhilStonier@ErtlAnthony I see all 24 wards and the Mayor's office! My overall is the fourth lowest, but in the middle of the pack (12th lowest) if you factor out salaries. The salaries chart doesn't consider the number of staff each office has.
@SierraFullerton I think the brief hail and wind caused some branch contact with wires, but not enough to short it. Eventually, there was enough contact to cause a short.
@SierraFullerton The annoying thing is the outages since the end of June have all been for different reasons.
29 June β supply loss from Hydro One, no details
1 July β rain storm
6 July β broken Hydro One transmission line
8 July β human error during Hydro One transmission line repair
@tiffmuise Buses shouldn't be evacuating if it's not safe. It's both operator training and plain common sense. Do you mind emailing me with more details (eg. bus number, exact location, etc.), so I can follow-up with staff?
[email protected]
@thatgirlkristyn@thinner1973 Hey Kristyn, send that to me in an email? Copy and paste what you shared on Reddit is fine. Just so I can follow up with you (unless OC's already responded).
@OccTranspo It looks more like Open Sans to me. The time is in another typeface, but it doesn't seem to match Inter (the 2 is the giveaway for me).
The ad is in Frutiger (City's corporate typeface).