@HudbayUS True width approx. 5 m) and a ‘feeder-dyke-type’ zone that returned intercepts of up to 21.1m of 2.4% Ni. The Keel Zone has been traced for 600 metres
down-plunge and remains open down-plunge while the Feeder Zone is open along strike and at depth.
@HudbayUS The Rice Island Ni-Cu-Co-PGE sulphide deposit is comprised of a ‘keel’ of higher-grade mineralization where previous drilling returned intercepts of up to 14.7m grading 3.63% Ni, 1.13% Cu, 0.12% Co (March 22, 2016
“The proximity of the Project to the existing infrastructure in Snow Lake, the simple, predictable geometry and excellent expansion potential all support that this asset should be re-valued to the upside, within Wolfden’s pipeline of high-quality advanced projects.”
“This initial Mineral Resource Estimate confirms that Rice Island Deposit has sufficient size, grade and expansion potential to be regarded as a significant development project in the North American EV metal space,” commented Ron Little, President and CEO for Wolfden.
#Silver#Copper#Zinc#Nickel#Gold
Next 6 months at @WolfdenR are packed with catalysts!
3 Separate Resource Updates:
Q4/21 from Pickett Mountain
Q1/22 from Rice Island and Nickel Island
#Silver Projects – New Brunswick
• Historic drill intercepts include 534.8 g/t silver and 0.52 g/t gold over 4m (TW ~3.2m)
• Eight holes have been completed to date (1,273 meters). Four of the holes tested the California Lake Zone.
Excited to share that @WolfdenR has completed 16 drill holes between two of its #exploration projects and assays are pending from Big Silver in Maine and #silver rich projects in New Brunswick
+100 holes to an average depth of 125 m) were anomalous in silver and most were not assayed for gold. One hole contained 8.0 m at 13.5 g/t gold (TW unknown).
polymetallic mining operations in North
America and reinforces the technical merits and financial capacity of the project. We look forward to proceeding with
the rezoning process and the goal of a possible conclusion in H1 2022.”
“We are also pleased with the recent filing of an updated rezoning document for the Pickett Mt. Project. The additional study work during H1 2021 and changes to the conceptual mining and processing
layouts would result in one of the most modern and environmentally friendly