Small ventilation job with week for a customer in Hampshire.
A 12” Intake fan added to a small commercial kitchen to augment the exsting Ventilation/Extract system.
fitted along with associated switchgear wired through a double pole contactor for emergency shutoff through the GSS
Another Navitas Board fitted for a customer In Hampshire.
40A Garage supply, tails split, Fused isolator fitted to protect garage feeder & an attempt to tidy a very Busy supply cabinet after EV install by others.
Split staff accommodation supply requiring Electric water heater and cooking facilities with at capacity incoming supply.
Garo Priority board with lighting split.
Not ideal in the short term but a workable solution.
Start of a Bit of Sub Main installation this week 50mm swa wrestling in a tight location, getting ready for front end RCD and final Connection to incomer.
Outdoor light installation for a customer in Romsey.
External PIR installed due to the internal Pir/Photocell being blinded by Infrared Led on adjacent security camera.
After trialling many options the IS1 from @SteinelUK mounted above the infrared field supplied the solution.
Something different this week, 100V line foreground music system upgrades for a customer in West Sussex.
JBL Control 85M’s installed along with new underground terminations to replace the some of the tired original 100v line speakers around their site.
@jblaudio_uk
#ohmslaw
Week of Spa treatment room lighting upgrades from Tungsten to LED using @JCCLighting V50 with Emergency Packs where required for Fire safety compliance & of course ticking the Part L compliance for a Commercial customer in Hampshire.
A week of plant room upgrades for a customer in hedge end, @Aico Ei3018 / Ei28RBU /SAB300R.
Emergency bulkhead upgrades as required including fixing exsisting plastic containment with metal fire cleats/fixings.
@QvisLighting
Central MEV switch solution, how to initiate Timed Vent Purge in two separate bathrooms across two RCD’s on a split load board without circuit re-wiring.
#NAVITASCP