After 225 days of tunneling from RMS Shaft (Vellara) to Langford Town Station for a length of 597.80 m, TBM Varada achieved a breakthrough on 09.09.2022 at 10.30am.
After 225 days of tunneling from RMS Shaft (Vellara) to Langford Town Station for a length of 597.80 m, TBM Varada achieved a breakthrough on 09.09.2022 at 10.30am.