$GOOGL
-Kinda feared we would never see 220$ but as long as we don't break ATH we are, imo, still in a downtrend since that MSB
-Below 220 would be a generational entry
-We could also develop a range here in which case I might buy the bottom of it but with less size
$HOOD
-Looks like a good opportunity/zone to continue the bull trend
-Fibonacci OTE
-Approaching WEMA 200
-Previous ATH zone
-40% filled @ 75$
-60% remaining at 0.75
$HOOD
-Looks like a good opportunity/zone to continue the bull trend
-Fibonacci OTE
-Approaching WEMA 200
-Previous ATH zone
-40% filled @ 75$
-60% remaining at 0.75
$HYPE
-Got that H4 MSB
-Bought as planned
-Confirmation would be D MSB
-Next stop should be 49/50$ for the top of previous range as we just got the retest of the low
$HYPE
- Bottom is in imo, I have a good entry at about 27$
-Sold ~30% at ~39$
-Tried buying back what I sold between 35/30$
-Got filled a bit, buying the rest if we break the structure on H4
-Above DEMA 200
-Back in HTF range, expect top of the range next if we bounce here
$BTC
-RSI 50 level on 3M timeframe usually means bottom
-Buying below M 50EMA & W 200EMA has always been a good idea
-Bottom formed a bit below 0.618-0.786 each time
-Buying below 64k is a good idea just by the fact that, IMO, it means 100% within a few years
Bidding 50-35k
$HYPE
- Bottom is in imo, I have a good entry at about 27$
-Sold ~30% at ~39$
-Tried buying back what I sold between 35/30$
-Got filled a bit, buying the rest if we break the structure on H4
-Above DEMA 200
-Back in HTF range, expect top of the range next if we bounce here