The introduction of the LR1750 gives our engineering team additional options when developing lifting solutions around site constraints and programme requirements.
Read the full story here: https://t.co/G52BKtJb8R
Introducing the LR1750
With a lifting capacity of 750te, the LR1750 is the latest heavy lift crane to join the Allelys fleet and our first crawler crane.
It joins the 1,200te capacity AK912 and 550te capacity LG1550, further strengthening our heavy lift capability.
We’re recruiting for an Asset Manager to join the team.
We’re looking for someone with experience in asset, fleet or plant management who is analytical and prepared to take a hands-on approach to resolving problems.
For more details and to apply: https://t.co/x9W6yi5FMh
Over the weekend, Allelys set a new UK record for the heaviest girder frame trailer moved on UK roads.
The transport involved a 400te cable reel supported within a 23te cradle, giving a total load weight of 423te and a gross trailer weight of 670te.
Yesterday, the Allelys team attended the Career Transition Partnership Employment Fair at Telford International Centre to speak with Armed Forces service leavers about career opportunities across the business.
#CTP#ServiceLeaver#Careers
Allelys transported a 57te Conqueror Mk 2 ARV from the Imperial War Museum to Morayvia Aviation Museum.
At 8.9m long and 4m wide, it required a specially built 2-bed-4 low beam trailer supported on blocks to distribute the weight evenly for transport.
Allelys has completed the discharge and transport of a 221te generator, 145te transformer and 101te flywheel.
The LG1550 discharged the generator and transformer onto a 17 axle flat top drawbar trailer, with a neck 7 trailer used for the flywheel.
A closer look at the discharge of two 186te transformers for the Eggborough BESS project, where the AK912 lifted both units at a 62m radius.
The discharge formed part of our wider project scope to receive, transport and install both transformers.
Did you spot us on the latest series of DIY SOS? 📺
We were pleased to support the ‘Bringing Dan Home’ episode by transporting the roof trusses for the build.
It was great to see everyone’s hard work come together and we’re glad we could play a part in helping bring Dan home.
At the Science & Innovation Park in Wiltshire, Allelys transported two Fowler BB1 ploughing engines, each weighing 18t. Using an electric forklift, step frame ramp trailer and hydraulic winch, the team safely relocated the historic engines while protecting site flooring.
See you at the #HeavyLiftAwards2026 tonight!
We're proud to be shortlisted for Overland Transport Provider of the Year, a reflection of the hard work of the entire Allelys team. As event sponsors, we can't wait to celebrate the sector's achievements with everyone attending.
It's nearly time for this year's #HeavyLiftAwards2026 and we're looking forward to celebrating with all of the other finalists.
This year we are shortlisted for Overland Transport Provider of the Year.
We look forward to celebrating with everyone next week!
When our 10th girder frame joined the fleet, it was just one part of a much bigger solution.
Planning, engineering, HSEQ, permits, project management and operations combined to move two 224te generators from Leith to Eccles.
Watch the full project video.
Allelys' Senior Commercial Manager Richard Cross will be attending the BTS 2026 Conference & Exhibition today in Westminster.
If you're attending and would like to chat to Richard, get in touch.
The UK’s journey to net zero encompasses a multitude of critical infrastructure projects, each with its own goals and challenges. These specialist projects require specialist knowledge, experience and equipment.
The AK912 was recently in action near Watford to complete the emergency removal of the Oxhey Grange footbridge. The work was required after significant deterioration was identified in the structure.
Thank you to @networkrail for the great footage.
Today our Senior Commercial Manager Garnaud Tsika will be attending GRID at the Excel in London.
If you are attending and would like to chat with Garnaud, get in touch.
We know that many factors play a part in the successful delivery of a national infrastructure project. Time is crucial and safety is paramount, therefore we leverage our equipment alongside our in-house expertise to truly add value to each and every project.
Health, Safety, Environment and Quality are fundamental to Allelys and embedded in every aspect of our operations. From initial planning and engineering through to execution and completion, we uphold the highest standards to ensure consistency, responsibility and safety.
Today our Commercial Manager Simon Davies is attending Solar & Storage Live at the NEC.
With the UK on a journey to a more sustainable future, Allelys are perfectly positioned to enable that commitment to be delivered.